Ms. Katie Larsen <br />02/07/2019 <br />Page 3 <br />Lyngblomsten Preliminary Plat Engineering Review <br />7. The applicant shall update the water quality section based on our attached redlines. At <br />the time of this review, no water quality design changes need to be made. The redlines <br />are intended to clarify the design and the requirements. <br />a. The water quality design may need to be adjusted based on other comments in <br />this review. <br />b. The dead storage volume should account for the entire site. The pond needs to <br />over-treat the areas being directed to the pond to compensate for the areas <br />leaving the site without treatment. <br />8. The Water Reuse system will be supplemented by municipal water in low conditions: <br />a. The applicant shall provide calculations demonstrating the amount of infiltration <br />provided. <br />b. Provide an elevation (below the NWL) that the irrigation system will need to <br />switch to City water during dry periods. <br />c. With the final design additional detail will be required and reviewed. <br />9. All storm sewer pipes that will be maintained by the City shall be concrete pipes per City <br />standard specifications. <br />10. All storm sewer pipes that will be maintained by the City shall have a minimum diameter <br />of 15”. <br />11. The plan set shall show the storm sewer plan view and easement lines on the same <br />page. This will allow the City to verify all storm and utility easements are correct. <br />12. In the Storm Sewer Pipe Sizing spreadsheet, the applicant shall include the Hydrology <br />input values (area, C values, time of concentrations, intensities). <br />13. The applicant shall verify the manhole sizes/storm sewer layout for: <br />a. CB 037, tight angle, consider storm sewer realignment. <br />b. CB 004, tight angle, larger structure needed. <br />c. CB 001, tight angle, larger structure needed. <br />d. CB 101, tight angle, larger structure needed. <br />e. CB 011, tight angle, larger structure needed. <br />f. CB 013, tight angle, consider storm sewer realignment. <br />g. CB 008, tight angle, larger structure needed. <br />h. Additional CB’s required between CB 1 & 2 at the road bend. <br />14. On Sheet C1.51, in section D of the “General Construction Sequence”, the applicant <br />shall add the following note prior to note 3 “Locally Strip topsoil…” <br />a. “Prior to site disturbance, construct a construction detention pond (in the <br />location of the proposed pond) to help treat soil runoff during construction.” <br />15. On Sheet C1.51, in section D of the “General Construction Sequence”, the applicant <br />shall add the following note prior to note 11 “Complete stabilization of the…” <br />a. “Prior to final stabilization, verify the proposed pond is constructed to final <br />grade. Clean out any accumulated deposited sediments during construction.” <br />16. On Sheet C1.51, in section G of the “General Construction Sequence”, the applicant <br />shall add the following note. <br />a. “Street Sweeping (with a pickup broom only) will be provided as needed or at <br />the direction of the owner/engineer.” <br />17. On Sheet C1.51, the applicant shall include erosion control blanket on the pond slopes <br />above the NWL. <br />18. On Sheet C1.51, the applicant shall include erosion control blanket on all back-yard <br />swales and 50’ around all back-yard catch basins. <br />19. At the 24 inch diameter westerly pipe outlet we recommend connected the pond outlet <br />to the existing pipe via a manhole with and open grate. <br /> <br />• Water Supply <br /> <br />The proposed site is currently not served by municipal water and on site wells shall be abandon per <br />MDH. This area of the City, Woodridge Estates, is currently a low pressure area. The City’s <br />Comprehensive Plan and water system model identifies the need for a 12-inch diameter trunk <br />watermain to be looped through the Lyngblomsten development site to serve the fire flow needs for