Ms. Katie Larsen <br />02/07/2019 <br />Page 4 <br />Lyngblomsten Preliminary Plat Engineering Review <br />the site, and to improve flow within this area of Lino Lakes. The Lyngblomsten site will also have an 8- <br />inch diameter watermain and service lines throughout the site. <br /> <br />Comments: <br />1. The applicant shall loop an 8 inch diameter watermain between the north and south <br />access along the east side of the site, adjacent to Hodgson. <br />2. The applicant shall loop the 12-inch diameter trunk watermain from the north access to <br />the Raven’s Hollow development. This section of trunk watermain can be installed by <br />the developer and reimbursed by the City, or the developer can petition the City to <br />complete the improvement. Offsite easements maybe required for this work. <br />3. Public watermain shall be Ductile Iron Pipe (DIP). <br />4. Watermain fittings shall be compact AWWA C153 fittings. <br />5. Hydrant spacing shall be 200-feet (linear) max. The applicant shall provide detail or a <br />figure of current hydrant spacing & coverage. <br />6. The applicant shall note that services Type K copper pipe from the main to the curb <br />stop. <br />7. The applicant shall provide a profile views of the proposed watermain in the construction <br />plans. <br />8. The applicant shall note the water connection location on the southwest end of the site <br />will be adjusted as the City finalizes the construction plans for this project. <br />9. The watermains shall be extended to the east side of Hodgson Road at both the north <br />and south access roads. <br />10. The City’s water model has accounted for the proposed land use. However, to verify the <br />water supply the applicant should submit their required fire flow for each structure <br />they’re proposing for model verification. <br /> <br />• Sanitary Sewer <br /> <br />The project site is currently not served by municipal sanitary sewer. The City of Lino Lakes is <br />working on a trunk sanitary sewer project including a Lift Station and forcemain to serve <br />approximately 60 acres. This service area includes the Lyngblomsten site and an unserviced area <br />east of Hodgson Road. The Lyngblomsten project proposes serving the development with municipal <br />sanitary sewer and services extended to each lot. <br /> <br />Comments: <br />1. Public sanitary sewer shall be PVC pipe, and SDR 35 or SDR 26 depending on depth of <br />pipe. <br />2. Sanitary sewer services shall be PVC sch. 40 pipe. <br />3. The applicant shall update the minimum sanitary sewer sizes to 8-inch diameter PVC <br />pipe. Service minimum size is 4-inch diameter. <br />4. The applicant shall note that sanitary sewer lines and invert elevations will need to be at <br />max depth for future utility extension to the east of Hodgson Road. <br />5. The applicant shall note the sewer connection location at the lift station will need to be <br />adjust as the City finalizes the construction plans for this project. <br />6. The sewer shall be extended to the east side of Hodgson Road at both the north and <br />south access points. <br />7. The applicant shall provide profile views of the proposed sanitary sewer in the <br />construction plans. <br />8. The applicant shall note that service pipe slopes shall be 2.0% minimum. <br /> <br />• Transportation <br /> <br />The existing site includes a single family home on the center large parcel and two commercial <br />buildings on the south end of the project. There was also a restaurant on the corner of Hodgson <br />Road and CR J that has been removed. The applicant is proposing to remove existing site accesses <br />from county roads, and off Hodgson Road construct a full access on the north end of the site and a