My WebLink
|
Help
|
About
|
Sign Out
Home
Search
1973 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
1973
>
1973 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 11:09:57 AM
Creation date
3/22/2019 11:42:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Council Meeting Type
Regular
Ordinance Title
Granting Franchise to Northern States Power Company
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 <br />MUNICIPAL WATER PUMPING SERVICE <br />Availability Available for the operation of pumping plants of municipally owned <br />water works. Lighting and heating limited to incidental use in operating power <br />equipment. <br />(Rate schedule applied separately to each delivery point) <br />Rate First 2 000 kilowatt-hours per month @ 2.29per kwh <br />Next 2 000 " " " " @ 1.76 " " <br />Excess " " " " @ 1.23 " <br />Fuel Clause Bills subject to the adjustment provided for in Fuel Clause <br />Rider No. 1. <br />Monthly Minimum Charge First 1 HP or less of connected load - $1.00 <br />Excess HP of connected load @ $.25 per HP <br />Power Factor Customer shall at all times take and use power in such manner that <br />the power factor shall be as near 100'/ as possible, but when the average power <br />factor is less than 80%, customer agrees to install the necessary corrective <br />equipment to raise such power factor to at least 807.. The average power factor <br />is defined to be the quotient obtained by dividing the kilowatt-hours'used <br />during the month by the square root of the sum of the squares of the kilowatt- <br />hours used and the lagging reactive kilovolt -ampere -hours supplied during the <br />same period. Any leading kilovolt -ampere -hours supplied during the period will <br />not be considered in determining the average power factor. <br />Standby and Supplementary Service Available for service to pumping plants of <br />municipally owned water works when an interconnected water system of such <br />water works includes a pumping plant using a source of power other than <br />electricity supplied by Company. <br />Rate The billing for each pumping plant served by Company shall be in <br />accordance with the above except that if the total net payments during any <br />contract year following the installation of a source of power other than <br />electricity supplied by Company amount to less than $15.00 per horsepower <br />of connected load of all pumping plants served by Company at the beginning <br />of such contract year, the difference between said $15.00 per horsepower and <br />said total net payments shall be included in the bill for the last month of <br />such year and Customer shall pay same as a charge for service rendered. <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.