My WebLink
|
Help
|
About
|
Sign Out
Home
Search
1973 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
1973
>
1973 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 11:09:57 AM
Creation date
3/22/2019 11:42:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Council Meeting Type
Regular
Ordinance Title
Granting Franchise to Northern States Power Company
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br />MUNICIPAL SEWAGE PUMPING SERVICE <br />Availability Available to municipal sewage systems for operation of pumping and <br />sewage treatment plants when all pumping and other power requirements at all <br />plants are supplied hereunder. <br />(Rate schedule applied separately to each delivery point) <br />Rate First 1 500 <br />Next 1 500 <br />Excess <br />kilowatt-hours per month <br />@ 2.82c <br />@ 1.76c <br />@ 1.23c <br />per kwh <br />I <br />1� n <br />Fuel Clause Bills subject to the adjustment provided for in Fuel Clause <br />Rider No. 1. <br />Monthly Minimum Charge First 1 HP or less of connected load - $1.00 <br />Excess HP of connected load @ $.50 per HP <br />Power Factor Customer shall at all times take and use power in such manner that <br />the power factor shall be as near 1007 as possible, but when the average power <br />factor is less than 80`/, customer agrees to install the necessary corrective <br />equipment to raise such power factor to at least 80%. The average power factor <br />is defined to be the quotient obtained by dividing the kilowatt-hours used <br />during the month by the square root of the sum of the squares of the kilowatt- <br />hours used and the lagging reactive kilovolt -ampere -hours supplied during the <br />same period. Any leading kilovolt -ampere -hours supplied during the period will <br />not be considered in determining the average power factor. <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.