My WebLink
|
Help
|
About
|
Sign Out
Home
Search
1973 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
1973
>
1973 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 11:09:57 AM
Creation date
3/22/2019 11:42:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Council Meeting Type
Regular
Ordinance Title
Granting Franchise to Northern States Power Company
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br />ALL ELECTRIC FARM SERVICE (Contd) <br />e. The installation shall not be used to supplement any other system of <br />providing hot water service. <br />f. Company reserves the right to control service to the water heating load. <br />2. The specifications for an Approved Space Heating Installation under this <br />rate are as follows: <br />a. Electric space heating equipment (except 120 volt units individually <br />rated at 15 amperes or less) shall be designed to operate at 240 volts, <br />shall be permanently installed and shall be the sole source of space <br />heating except that provided by fireplaces. <br />b. Not more than 10 kilowatts shall be switched at one time by the <br />heating system controls. <br />c. Company reserves the right to control service to the space heating load. <br />3. Transformer type welding machines larger than 25 kilovolt -amperes will not <br />be permitted on this rate. <br />4. Where two or more farm customers are served from the same transformer, <br />the minimum charge for each customer will be based on the transformer capacity <br />required adequately to serve him, without regard to the transformer capacity <br />actually installed or the minimum charges of other customers served from the <br />same transformer. The Company reserves the right to install load limiting <br />devices for the protection of its transformers and equipment and for the de- <br />termination of the appropriate transformer size. <br />5. Temporary enlargement of transformer capacity for such purposes as corn <br />drying and hay drying shall be treated as Temporary Service. <br />6. If three phase service or primary voltage service is supplied it shall <br />be under rates available for such service. <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.