My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-27-2006 EDA Packet
LinoLakes
>
City Council
>
Economic Development Authority (EDA)
>
Packets
>
2006
>
11-27-2006 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 3:22:52 PM
Creation date
3/26/2019 3:27:46 PM
Metadata
Fields
Template:
EDA
EDA Document Type
EDA Packet
Meeting Date
11/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WORK ORDER <br /> 1. PM WO# - Work order number <br /> 2. CRAFT —Who is to complete the task <br /> 3. PRIORITY— Priority level (high, standard, mid, low) <br /> 4. EQUIPMENT — Description of maintenance item <br /> 5. GENERAL LOCATION — General location of item <br /> 6. SPECIFIC LOCATION — More specific area within general location <br /> 7. DETAILED EQUIPMENT DESCRIPTION — Information about the equipment that <br /> will help assist with PM work, repairs, or replacement <br /> 8. WORK DESCRIPTION — Scope of preventive maintenance work <br /> 9. ASSIGNED TO — Specific person or contractor (optional) <br /> 10. CURRENT METER — Current meter reading is recorded here when the work <br /> order is complete (optional) <br /> 11. DATE — Date this work order is completed <br /> 12. REG HOURS —Actual time it took to complete this task <br /> 13. PARTS $ - Cost of parts used to perform PM (optional) <br /> 14. PERFORMED BY— name, and signature or initials of person completing the <br /> work order <br /> 15. This space is used for listing supplies used, notes about other problems found or <br /> repaired during PM, or reasons why this work order might have to be deferred <br />
The URL can be used to link to this page
Your browser does not support the video tag.