Laserfiche WebLink
III III II IIII II I II IIIIIII II II 1666 Coffman Printed: 05/08/2000 <br /> I <br /> Q <br /> PM WO# 2011 For Week: 18/2000 Craft: MAINT Due: 05/08/2000 Priority:'4-Standard <br /> Equipment: Heating Coil Location: 1ST FLOOR <br /> `J Specific Location: N.W. Stairwell <br /> Area Served: <br /> ln�Model#:' RBD-75 <br /> Serial#: 8/86 <br /> Type: HC <br /> Manufacturer: or Order Title: Heating Coil Operation Check <br /> Service Co: <br /> Perform maintenance tasks As Applicable: <br /> 1.Check filter and change as needed <br /> 2. Lubricate fan motor as needed <br /> 3. Bleed coil <br /> 4.Clean coil as needed <br /> WO# Maintenance Item# Work Desc Code Assigned To Current Meter Begin <br /> 2011 HC01 HEATCOILCHECK ® Co End__ Date— <br /> Reg Hours OT Hours Parts$ Down Time Travel Time Purchase Order# <br /> Odometer Begin <br /> Odometer End <br /> Comments: <br /> 1� <br /> Performed By: Accepted By: <br /> ;mos: <br /> Filter <br /> 10X25X1 <br /> f� <br /> Pmnnl rav 113f1gq <br />