Laserfiche WebLink
% of Total Cost Per S.F. Cost <br />D4010 Sprinklers $8.70 $44,800.00 <br />D4020 Standpipes $2.00 $10,300.00 <br />D5010 Electrical Service/Distribution $4.35 $22,400.00 <br />D5020 Lighting and Branch Wiring $9.48 $48,800.00 <br />D5030 Communications and Security $3.50 $18,000.00 <br />D5090 Other Electrical Systems $0.32 $1,650.00 <br />0% $0.00 $0.00 <br />E1090 Other Equipment $0.00 $0.00 <br />0% $0.00 $0.00 <br />0% $0.00 $0.00 <br />100% $166.03 $855,000.00 <br />10.00% $16.60 $85,500.00 <br />0.00% $0.00 $0.00 <br />0.00% $0.00 $0.00 <br />$182.62 $940,500.00 <br />Wet pipe sprinkler systems, steel, light hazard, 1 floor, 2000 SF <br />Wet pipe sprinkler systems, steel, ordinary hazard, 1 floor, 1000 SF <br />Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1 <br />floor <br />Overhead service installation, includes breakers, metering, 20' <br />conduit & wire, 3 phase, 4 wire, 120/208 V, 400 A <br />Feeder installation 600 V, including RGS conduit and XHHW wire, <br />400 A <br />Switchgear installation, incl switchboard, panels & circuit breaker, <br />120/208 V, 1 phase, 400 A <br />Receptacles incl plate, box, conduit, wire, 10 per 1000 SF, 1.2 watts <br />per SF <br />Miscellaneous power, 1.8 watts <br />Central air conditioning power, 6 watts <br />Fluorescent fixtures recess mounted in ceiling, 1.6 watt per SF, 40 <br />FC, 10 fixtures @32watt per 1000 SF <br />Communication and alarm systems, fire detection, addressable, 12 <br />detectors, includes outlets, boxes, conduit and wire <br />Fire alarm command center, addressable without voice, excl. wire & <br />conduit <br />Generator sets, w/battery, charger, muffler and transfer switch, <br />gas/gasoline operated, 3 phase, 4 wire, 277/480 V, 15 kW <br />E Equipment & Furnishings <br />F Special Construction <br />G Building Sitework <br />SubTotal <br />Contractor Fees (General Conditions,Overhead,Profit) <br />Architectural Fees <br />User Fees <br />Total Building Cost <br />Lino Lakes 49 Club Redevelopment TIF District <br />Letter of Finding <br />LHB Project No. 150099 Page 3 of 3 <br />Replacement Cost Report <br />Map A