Laserfiche WebLink
CITY COUNCIL <br />AGENDA ITEM 5A <br />STAFF ORIGINATOR: Justin Williams, Utilities Supervisor <br />MEETING DATE: March 25, 2019 <br />TOPIC: Consider Resolution No. 19-35, Accepting Bids and Awarding <br />Construction Contract For Civic Complex Roof Replacement <br />Project <br />VOTE REQUIRED: 3/5 Vote Required <br />INTRODUCTION <br />Staff is requesting authorization to accept quotes and award the construction contract for the <br />Civic Complex Roof Replacement Project. <br />BACKGROUND <br />The City Council approved Resolution No.19-12, Ordering the Project, Approving Plans and <br />Specifications, and Authorizing Advertisement of Bids for Civic Complex Roof Replacement <br />Project at the January 28, 2019 City Council meeting. <br />Quotes were received for the above -referenced project on March 6, 2019. The quotes were <br />checked for mathematical accuracy and tabulated. <br />CONTRACTOR <br />BASE BID <br />ADDITION #1 <br />TOTAL QUOTE <br />Palmer West Construction <br />$698,000.00 <br />$244,950.00 <br />$942,950.00 <br />Berwald Roofing <br />$686,800.00 <br />$288,000.00 <br />$974,800.00 <br />Central Roofing Company <br />$817,659.00 <br />$222,200.00 <br />$1,039,850.00 <br />The low quote was submitted by Palmer West Construction, Rogers, Minnesota, in the amount <br />of $942,950.00 <br />The Base Bid portion of the project will be covered by insurance. Addition #1 includes <br />replacement of the ballasted roof areas. With the rubber membrane of the ballasted roof areas <br />(flat sections) approaching the average life expectancy of 20-25 years (Civic Complex <br />constructed in 1999), we are recommending replacing all roof sections. This will allow the <br />membrane of the lower roof areas to be installed higher up the sloped roof areas prior to <br />installation of the new standing seam roof. This ensures that the roof areas are adequately <br />transitioned and water tight prior to the installation of all metal components. The City Council <br />had previously set aside $311,000 for Addition #1. <br />