Laserfiche WebLink
4.1.1.2 standby power generating capacity at the headend. The Grantee <br />shall maintain motorized standby power generators capable of <br />powering all headend equipment for at least twenty-four (24) <br />hours. The back-up power supplies serving the System shall be <br />capable of providing power to the System for not less than three <br />(3) hours per occurrence measured on an annual basis according to <br />manufacturer specifications in the event of an electrical outage. <br />The Grantee shall maintain sufficient portable motorized <br />generators to be deployed in the event that the duration of a power <br />disruption is expected to exceed three (3) hours; <br />4.1.1.3 facilities of good and durable quality, generally used in high - <br />quality, reliable systems of similar design; <br />4.1.1.4 a System that conforms to or exceeds all applicable FCC technical <br />performance standards, as amended from time to time, which <br />standards are incorporated herein by reference, and any other <br />applicable technical performance standards. Upstream signals shall <br />at all times meet or exceed manufacturers' specifications for <br />successful operation of upstream equipment provided by the <br />Grantee or approved for use by the Grantee at any Subscriber's <br />premises. End of the line performance must meet or exceed FCC <br />specifications at the end of the Subscriber Drop; <br />4.1.1.5 a System shall, at all times, comply with applicable federal, State <br />and local rules, regulations, practices and guidelines pertaining to <br />the construction, upgrade, operation, extension and maintenance of <br />Cable Systems, including, by way of example (but not limitation): <br />(A) National Electrical Code, as amended from time to time; and <br />(B) National Electrical Safety Code (NESC), as amended from <br />time to time; <br />4.1.1.6 facilities and equipment sufficient to cure violations of FCC <br />technical standards and to ensure that Grantee's System remains in <br />compliance with the standards specified in subsection 4.1.1.5; <br />4.1.1.7 such facilities and equipment as necessary to maintain, operate and <br />evaluate the Grantee's System for compliance with FCC technical <br />and customer service standards, as such standards may hereafter be <br />amended; <br />4.1.1.8 status monitoring equipment to alert the Grantee when and where <br />back-up power supplies are being used, which capability shall be <br />