My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-29-2019 Council Packet (Budget)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
07-29-2019 Council Packet (Budget)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
7/19/2019 3:29:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/29/2019
Council Meeting Type
Work Session Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Budget ‐ Well House #1 Improvements <br />$625,000 ‐ Water UƟliƟes Fund <br />Well House #1 was built in 1971. It supplies treated water (chlorine, polyphosphate, and fluoride) to Lino <br />Lakes residents. The well house includes a 60HP electric pump motor, three chemical pumps, and one <br />booster pump. The facility itself sƟll has the original asphalt driveway, stucco siding, and meter. The roof is <br />made of a rubber membrane and the SCADA Equipment was last updated in 1994. The electrical panels have <br />deteriorated and are obsolete. <br />While the well is sƟll funcƟoning, it is in need of structural, compliance, and aestheƟc updates. The roof <br />leaks, the chemical storage room is non‐compliant (noƟfied by MN Department of Health in December, <br />2017), and the exterior needs updaƟng. <br />Improvements to the well house would include two new chemical storage rooms, upgraded plumbing and <br />meter, new roof, and repair or replacement of electronics and electrical panels. <br />July 15, 2019 <br />110
The URL can be used to link to this page
Your browser does not support the video tag.