My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-25-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
03-25-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
10/16/2019 11:51:50 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/25/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K:\012396-000\Admin\Spec\Quote Package 1 - Grading, Aggregate, Paving, Nets, Footings, Color Coating\SITE WORK LTR RECMMDTN-012396-000.docx 701 XENIA AVE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM March 13, 2019 <br /> Honorable Mayor and City Council City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 <br />Re: Arena Acres Park Site Improvements City of Lino Lakes, MN WSB Project No. 012396-000 <br /> Dear Mayor and Council Members: <br /> Quotes were received for the above-referenced project on Tuesday, March 12th, 2019. A total of four bids were received. The bids were checked for mathematical accuracy and confirmed that Midwest Asphalt, Eden Prairie, MN submitted the lowest quote in the amount of $70,487.10. Below is a table of the quote results for reference. <br />Midwest Asphalt Services (Low Bid) Bituminous Roadways New Look Contracting Barber Construction <br />$70,487.10 $71,276.90 $91,850.01 $85,569.00 <br /> The Engineer’s Estimate was $52,978.00. The earthwork, aggregate, and paving item quotes were higher than anticipated, which is likely due to the smaller quantities / scale of the work with <br />respect to costs of mobilizing equipment and crews. We recommend the City Council award a contract in the amount of $70,487.10 to Midwest Asphalt based on their low bid and past performance constructing parks. Sincerely, <br /> WSB & Associates, Inc. <br /> <br />Jason L. Amberg, PLA Group Manager, Principal <br />cc: Rick DeGardner, City of Lino Lakes Paul Hoffer, Midwest Asphalt
The URL can be used to link to this page
Your browser does not support the video tag.