Laserfiche WebLink
Traffic Study•Traffic Study completed by Swing Traffic Solutions January <br />2019 <br />•Proposed project generate 1,473 daily trips <br />•69 trips = AM peak period (7:00 to 8:00) <br />•123 trips = PM peak (4:30 to 5:30) <br />•Peak trip generation is 1/3 less than projected in Master Plan <br />•Existing daily trips: <br />•8,400 on Hodgson Road <br />•10,700 on CR J (west of Hodgson) <br />•6,700 of CR J (east of Hodgson) <br />37