My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-08-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
04-08-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
10/16/2019 11:52:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/08/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> <br />Wall mounted down lit lighting is proposed on the exterior of the senior housing complex. <br />Street lights ranging from 12 to 28 foot in height with down lit shields will be utilized in the <br />parking lot and near the main entrance and loading area. Foot candles do not exceed 1.0 fc onto <br />right-of-way as required by City performance standards. <br /> <br />Two 15 foot street lights with down lit shields are proposed in the parking areas in the cottage <br />home neighborhood. The photometric plan indicates zero (0) foot candle levels protruding onto <br />adjacent residential properties. <br /> <br />The applicant shall work with the local electric company to design a street lighting plan for the <br />public road. <br /> <br />• Security or service lighting should be limited in coverage area and designed to reduce <br />glare. <br /> <br />Wall mounted down lit lighting is proposed on the exterior of the senior housing complex and <br />clubhouse. <br /> <br />Stormwater Management <br /> <br />• Stormwater management design must incorporate filtration and infiltration elements. This <br />could include such features as rain gardens, swales, dry creeks, infiltration chambers, and <br />other ecologically based methods along with more traditional ponds and pipes. <br /> <br />• Stormwater management ponds, if used, should be designed to be a site amenity, including <br />appropriate landscape elements. <br /> <br />Per the revised Storm Water Management Report prepared by Anderson-Johnson Associates <br />dated March 11, 2019, rate control is being accomplished using a combination of a dry pond <br />and a storm water treatment pond. The dry pond is now located where the original community <br />gardens were proposed. The proposed rate is less than 80% of the existing rate of runoff. <br /> <br />Water quality treatment is accomplished at the single stormwater treatment pond. True <br />infiltration was considered during the design phase, but several factors contributed to not <br />pursuing infiltration practices. First, shallow groundwater exists on site. According to the soil <br />borings, groundwater is in the 895 to 897 elevation range. A majority of the low points are <br />around elevation 905 with one parking lot having a low point of about 902.5. This would mean <br />the surface of an infiltration area would need to be at elevation 900 - 901 for effective drainage <br />to occur. Additionally, the site has been maximized and there is not adequate space for <br />effective infiltration practices. <br /> <br />Instead, a stormwater pond has been constructed. The stormwater pond, in addition to <br />providing rate control, has been sized to provide adequate dead storage below the normal water <br />level to meet water quality requirements. Finally, an irrigation pumping station will be <br />constructed at the stormwater pond to draw water from the pond to irrigate the surrounding <br />areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.