<br />4. The applicant shall label storm structures. <br />Storm structures are labeled on the final plans and noted on the grading. <br />5. The applicant shall provide explanation as to why they HydroCAD model includes “Pond 400” which <br />is not shown on the drainage map. The location shall be confirmed within the drainage maps if <br />applicable. <br />Pond 400 is the downstream pond in Northpointe Development and was added for the <br />tailwater conditions of the pond. <br />6. The applicant shall povide 2.0 feet of freeboard from the 100-yr HWL existing adjacent walk <br />out property low entry elevations. The HWL elevation of the pond is 917.4 which is a 1 foot <br />freeboard. At the time the existing houses were constructed the pond was modeled pre Atlas <br />14. This was approved with the Northpointe PUD. Eastside villas lowers the 100-YR HWL from <br />917.5 to 917.4 (Atlas 14). <br />7. The applicant shall provide catch basin spacing calculations, and include structure size information <br />on the utility sheets <br />Spread calcs have been submitted. As discussed with Diane, double catch basin will not be <br />needed at the center low point. Structure size is shown on the storm sewer schedule on the <br />plans. <br />8. The applicant shall indicate in Table 2 of the SWMP what HydroCAD nodes are associated with <br />each row, and verify all inputs in the table are correct. <br /> S-NW is the subcatchment discharging northwest for proposed and existing conditions. <br /> Pond 500 is the discharge to the south for proposed and existing conditions. <br /> Reach 5R is the discharge to the northeast for proposed and existing conditions. <br />SWMP updated. <br />9. The applicant shall Provide a detailed explanation in the SWMP describing why volume reduction <br />requirements are not being met. Refencing other developments is not adequate explanation for rule <br />variances. <br />a Use the RCWD “Required Water Quality Treatment Volume (ft3)” equation to <br />quantify the required water quality volume <br />Section 2.5 of the SWMP discusses the clayey and silty soils located onsite. Northpoint <br />referenced as the borings were similar and the sites are adjacent to each other. <br /> <br />• Water Supply <br /> <br />8- inch watermain would be extended from an existing stub on Dogwood Street with 1-inch Type K copper <br />services extended to each lot. A temporary hydrant would be installed on the northwest stub street for future <br />looping and expansion on Butternut Street. <br /> <br />Comments: <br />1. The applicant shall show the locations of water services with final construction plans. <br />Services are shown on final plans. <br />2. The applicant shall provide pipe profiles with final construction plans. <br />Pipe profiles are shown on the final plans. <br />3. The applicant shall show a minimum of 10’ of separation between water main and sanitary sewer <br />(except for services). This is shown on the plans (note near STA. 4+00) <br />4. The applicant shall specify that ductile iron pipe (DIP) water main shall be encased in polyethylene <br />wrap. Note added to plans. <br />5. The applicant shall label the bend at Sta. 8+75, adjacent to MH 3. <br /> As discussed, GV moved to the bend location. (pipe deflection is only 4° so bend not necessary) <br />6. The applicant shall include road stationing in the profile view of the proposed utilities. <br />As discussed, the pipe alignment doesn’t follow the centerline alignment. MH centerline station <br />denoted in the profile view. <br /> <br />• Sanitary Sewer <br /> <br />8- inch Polyvinyl Chloride (PVC) Pipe would be extended from existing stub on Dogwood Street with 4-inch <br />Schedule 40 PVC services extended to each lot. The development proposes ending with a stub for future <br />extension and service of Butternut Street. <br /> <br />Comments: <br />1. The applicant shall show the locations of sanitary services with final construction plans. <br />Services are shown on final plans. <br />2. The applicant shall provide pipe profiles with final construction plans. <br />Pipe profiles are shown on the final plans. <br />3. The applicant should adjust sanitary sewer main and services to avoid services that are longer than <br />100 feet in length. If any services are required to be greater than 100 feet, then the applicant shall <br />add a note that clean outs are required on all sanitary services that are longer than 100 feet in