<br />5. The applicant shall include FINAL noise wall construction sheets and details shall be included in the <br />final utility/civil construction plans. The City recommends the acoustical plywood fence detail, with <br />two (2)-3/4” panels glued and screwed together with the proposed footings. <br /> Wall design and details submitted with final. This differs from the city recommendation (12.b). <br />6. It is recommended that the applicant move the driveways for Block 3, Lot 10 and Block 2, Lot 3 so <br />that they are not located on the curve/corner of the road. <br /> plan updated. <br />7. The applicant shall move trees on the Landscaping Plans so that they are not located over any <br />services or public utilities. It is recommended that these be moved as far from the proposed utilities <br />as possible. Plan updated to the extent possible. <br /> <br />• Site Grading <br /> <br />The Eastside Villas development proposes site grading prior to installation of utilities. Homes are proposed <br />to be “slab on grade” style. As part of the development, Pond 500 would be an expansion of an existing <br />pond that was constructed as part of the Northpointe development. <br /> <br />Comments: <br />1. The applicant shall show silt fence around the perimeter of Pond 500 <br />2. The applicant shall note that inlet protection shall be placed in existing downstream catch basins in <br />the Northpointe development. <br />3. The applicant shall show the existing drainage conditions (arrows or contours) of the south side of <br />Cedar Street. <br /> The applicant shall show the proposed drainage grades for the ditches in this area. It appears there <br />is a high point on Lot 2, Block 1 that would prevent the drainage from flowing south to the existing <br />pond. <br />Note added to daylight ditch to the west. <br />4. The applicant shall note the use of sediment control measures is required at inlet flared end <br />sections. <br />5. The applicant shall extend the silt fence/perimeter control measures to include adjacent wetlands to <br />the bituminous trail construction to the south. <br />6. The applicant shall provide further detail or plans for both retaining wall proposed on site. Types of <br />footings, foundations, drain tile, soils, etc. need to be included with the information. The applicant <br />should consider including wall section views/details. <br /> As discussed, wall designs will be submitted by the grading contractor <br />7. The applicant should consider leaving additional space around the retaining walls (away from the <br />noise wall & wetlands) to allow space for equipment to access the wall for necessary <br />repairs/excavations in the future. <br />As discussed, we are unable to move the wall due to the proximity to the fence and berm. <br />Wall material (modular) will ease future repairs. <br />8. The applicant shall provide the EOF for CB 104 & 107 and verify that the EOF provides 1 foot of <br />freeboard to Block 2 Lots 8&9. <br /> EOF added at the high point at STA. 5+50. EOF is at 922.3 which provides 1’ freeboard. <br />9. The applicant shall provide a SWPPP with the final construction plans for review. The SWPPP shall <br />be reviewed by the City’s Environmental Coordinator. <br /> As discussed, this has been submitted and reviewed by the city <br />10. The applicant shall Call out erosion control blanket on all swales and pond slopes. <br /> Note added to detail and blanket added to grading plan. <br />11. The applicant shall add redundant erosion control protection adjacent to the wetland. <br /> Double row of silt fence added. <br />12. The applicant shall provide a street sweeping plan. <br />Sections 4.3 and 5.2 of the SWPPP notes that the street shall be cleaned within 24 hours of <br />detection for tracked sediment. <br /> <br />• Stormwater Management <br /> <br />The stormwater management for the Eastside Villas development consists of catch basins at the low points <br />to convey stormwater to Pond 500, and discharge into JD3. <br /> <br />Comments: <br />1. For maintenance, the City recommends extending storm sewer through the backyards of the east <br />side of the development versus installing multiple flared end sections that discharge into MnDOT <br />right-of-way <br />2. The applicant shall label the bench around Pond 500. <br />3. The applicant shall note the locations of the outlet flared end sections underneath the berm on <br />Block 1. Are these proposed to be within MnDOT right-of-way? If so, permitting will be required.