Laserfiche WebLink
<br /> Direct Bore, Inc. Site Performance Agreement page 3 of 11 <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-Site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br />1. Lighting $ 0.00 <br />2. Fences / Screen Structures $ 15,000.00 <br />3. Trash Disposal Structures $ 0.00 <br />4. Curbing / Islands / Delineators $ 0.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins / <br />Culverts / Swales $ 0.00 <br />6. Public Trails and / or Sidewalk $ 0.00 <br />7. Private Trials and / or Sidewalk $ 0.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $ 15,000.00 <br />9. Water mains / Hydrants / Sanitary Sewers $ 0.00 <br />10. Landscaping $ 0.00 <br />11. Site Grading $ 0.00 <br />12. Erosion Control $ 0.00 <br /> Total Estimated Cost of Developer Improvements $ 30,000.00 <br /> Security Requirement (Total * 35%) $ 10,500.00 <br /> <br />III. DEVELOPER FEES. <br /> <br />Connection fees apply if connecting 502 Lilac Street to municipal utilities otherwise not <br />applicable. <br /> <br />A. Trunk Sanitary Sewer Connection Fees <br /> <br />The City established trunk utility connection fees to uniformly distribute <br />the costs of public trunk sanitary sewer infrastructure. The Trunk Utility <br />Connection Fee consists of two components; a Trunk Charge and an <br />Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the <br />time of hook-up, whichever is first. The Sanitary Sewer Trunk Charge is <br />$1,573.00 per unit. Commercial/Industrial/Institutional (CII) trunk charges <br />are based on a factor of 2.92 units per acre. <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first.