Laserfiche WebLink
<br /> Direct Bore, Inc. Site Performance Agreement page 2 of 11 <br />minutes a distance of 300 feet to the point of beginning; thence continuing South 0 <br />degrees 00 minutes a distance of 125 feet; thence West 0 degrees 00 minutes, a distance <br />of 352.98 feet to the west line of said Northeast Quarter of Northwest Quarter; thence <br />North 0 degrees 46 minutes 15 seconds West, a distance of 125.01 feet to the point of <br />intersection with a line that bears West 0 degrees 00 minutes from the point of beginning; <br />thence East 0 degrees 00 minutes, along said line, a distance of 354.66 feet to the point of <br />beginning. EXCEPT that part platted as Parcel 21, CITY OF LINO LAKES RIGHT-OF- <br />WAY PLAT NO. 2. <br /> <br />NOW, THEREFORE, in consideration of the mutual promises of the parties made herein, <br /> <br />IT IS AGREED BY AND BETWEEN THE PARTIES HERETO: <br /> <br />I. DESIGNATION OF IMPROVEMENTS. <br /> <br />A. Improvements on the project site to be installed at the Developer’s <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as “On-Site Work”. <br /> <br />B. Improvements off the project site to be installed at the Developer’s <br />expense, if any, by the Developer as hereinafter provided are hereinafter <br />referred to as “Off-Site Work”. <br /> <br />C. Developer shall enter into a Declaration for Maintenance of Stormwater <br />Facilities – Not applicable. <br /> <br />II. ON-SITE WORK. <br /> <br />A. On-Site Work. The On-Site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The On-Site Work includes all on-site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, sanitary sewer extension, water system extension, storm <br />drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading and <br />erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed