My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2019-107 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2019
>
2019-107 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 10:07:24 PM
Creation date
11/25/2019 4:08:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/26/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsb <br />August 23, 2019 <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal for Construction and Post Construction Phase Services <br />Water Tower No, 3 <br />City of Lino Lakes, MN <br />Dear Mr. Grochala: <br />We appreciate the opportunity to submit this letter proposal to the City of Lino Lakes to <br />provide construction services for the construction of Water Tower No. 3 and for the grading <br />of the adjacent park site. The construction of Water Tower No. 3 was recently bid on August <br />20, 2019. The tower will be a composite style elevated water tower with a storage capacity <br />of 1.5 rnillion gallons (MG). The location for Water Tower No. 3 has been identified on <br />City -owned property near Birch Street and Centerville Road. We will provide daily <br />construction administration; construction observation of the water tower foundation, <br />composite structure, and site work; construction surveying and staking; construction <br />observation of the steel tank bowl by a specialized independent company (KLM); post <br />construction services (warranty); material testing services; and construction observation and <br />surveying services for the park site grading The construction final completion date is <br />September 2, 2021, <br />Our Work Plan consists of the following major tasks: <br />1. Water Tower Construction Services <br />H. Water Tower Construction Observation by KLM <br />m. Water Tower Post Construction Services (2-Year Warranty) <br />W. Water Tower Material Testing Services <br />V. Park Site Grading Construction Observation and Surveying <br />1. WATER TOWER CONSTRUCTION SERVICES <br />I. Construction Administration <br />We will serve as the City's professional representative at the project site and issue <br />instructions to the Contractor on behalf of the City. Our proposal includes project <br />management and contract administration throughout construction. The Project Manager <br />will communicate directly with City Staffthroughout the duration of the project. We will <br />provide the following construction administration tasks throughout the construction <br />period: <br />a) Prepare and distribute construction contracts and additional sets of drawings and <br />specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.