My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2019-107 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2019
>
2019-107 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 10:07:24 PM
Creation date
11/25/2019 4:08:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/26/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br />August 23, 2019 <br />Page 3 <br />III. WATER TOWER POST CONSTRUCTION SERVICES (2-YEAR <br />WARRANTY) <br />WSB and KLM Engineering will provide post construction services for the 2-year <br />warranty. KLM Engineering will also provide a 2-year warranty inspection of the <br />water tower (included in attached proposal). <br />IV. WATER TOWER MATERIAL TESTING SERVICES <br />WSB will provide material testing services for the soil compaction and concrete <br />testing. A concrete composite water tower requires a significant amount of concrete <br />testing for the multiple concrete pours that will be completed. <br />V. PARK SITE GRADING CONSTRUCTION OBSERVATION <br />WSB will also provide construction observation for the grading of the adjacent park <br />site. This may require a second construction observer (separate from the water tower <br />construction). <br />V. SCHEDULE AND ESTIMATED FEES <br />A. Project Schedule <br />We have estimated the time for the project to begin immediately after City <br />authorization. The proposed schedule includes the following milestone dates: <br />Task <br />Dates <br />City Council Authorization to Proceed <br />August 26, 2019 <br />Begin Construction <br />September 16, 2019 <br />Substantial Completion (Water Tower in <br />Service) <br />August 2, 2021 <br />Final Completion <br />September 2, 2021 <br />2-Year Warranty Inspection <br />September 2021 <br />B. Estimated Fees <br />Compensation for tasks shall be on an hourly basis, based on the actual hours worked <br />for personnel assigned to the project. We propose to perform these services for the <br />following estimated fees. The proposed fees represent approximately 6.6 percent of <br />the construction cost. <br />Phase <br />Estimated Fees <br />I. Water Tower Construction Services <br />$155,341 <br />II. Water Tower Construction Observation by KLM <br />$85,327 <br />III. Water Tower Post Construction Services (2-Year Warranty) <br />$4,022 <br />IV. Water Tower Material Testing Services <br />$15,301 <br />V. Park Site Grading Construction Observation and Surveying <br />$10,896 <br />Total <br />$270,887 <br />
The URL can be used to link to this page
Your browser does not support the video tag.