Laserfiche WebLink
Well House No. 7 Feasibility Study <br />City of Lino Lakes, MN <br />WSB Project No. 013434-000 Page 9 <br />Work Category <br />Estimated <br />Cost <br />Masonry / CMU $75,000.00 <br />Tuckpointing $25,000.00 <br />Carpentry / wood $14,000.00 <br />Insulation / sealants $8,000.00 <br />Roofing / sheet metal $30,000.00 <br />Doors / windows / <br />hardware $25,000.00 <br />Interior walls $13,000.00 <br />Painting / prep $20,000.00 <br />Specialties $8,000.00 <br />Mechanical $127,500.00 <br />Electrical / lighting $255,000.00 <br />Overhead & profit $25,000.00 <br />Total $1,018,900.00 <br />The following are sub-components of the line items above: <br />General conditions: Bonds and insurance <br />Permits <br />Salaries <br />Protections / temporary enclosures <br />Safety <br />Temporary power <br />Tools <br />Dumpsters / clean up <br />Site work: Mass excavation <br />Digging footings <br />Backfill <br />Compaction <br />Class V and pavement <br />Site concrete <br />Masonry New CMU walls <br />Brick infill wall at NW corner <br />Miscellaneous repairs to existing brick <br />Interior walls: Framing at interior side of exterior walls <br />FRP wall panels <br />Specialties: Roof hatch <br />Louvers <br />Signage <br />Fire extinguishers