Laserfiche WebLink
S:\Community Development\Projects\Planning Studies\2040 Comprehensive Plan\Agency Review\Affected Jurisdictions Review\20191106 Comments Review Page 6 <br />2040 Comp Plan Review Key <br />11/6/2019 Material <br />Editorial <br />Note <br />Commenter Date Comment <br />#Page Section, Figure, <br />Table, Etc.Column Comment <br />MaterialEditorialNotePlan <br />Change <br />Made <br />(Y/N) <br />Comment Responses / Action <br />Comments represent changes in material and content of the plan. <br />Comments represent spelling, grammatical, clarification, or visual <br />issues with graphics. <br />Generally consist of a statement expressing a perspective. <br />4 The City would like to discuss the future I-35W /I-35E connector plans, such as <br />the proposed full access interchange on 80th street. They would like to <br />recommend exploring alternative solutions to reduce the potential adverse <br />impacts on existing residential neighborhoods on Funnan St. NE (pictured on the <br />back) caused by an increase in traffic volume. <br />X N <br />We encourage continued discussion with all <br />affected jurisdiction including Anok and <br />Washington County. See Hugo 1 below. <br />City of Ham <br />Lake <br />5/28/2019 None N/A <br />1 80th Street. As you may know, there was effort with the l-35W /E coalition to <br />collaborate on improvements along 1-35 in several communities and Counties. <br />The discussions included this connection and interchanges at l-35E and l-35W. <br />Lino Lakes participated in the coalition meetings. The City is interested in <br />cooperating with adjacent jurisdictions on creating a corridor management plan <br />that would include representatives of the 1-35 W/E coalition to further this <br />planning effort. In addition, the City supports an interchange location for l-35E at <br />CR-140 (80th Street). <br />X <br />2 CR-84. The Lino Lakes Transportation Plan recommends proposed new <br />roadway connections. Specifically a new County north-south route (extension of <br />CR-84/Otter Lake Road). It would seem that this road is intended to be a County <br />Road shared by Washington and Anoka Counties. Similar to CR-140, we <br />recommend a corridor study be initiated by Anoka and Washington Counties <br />including representatives from all cities along the corridor. <br />X N <br />We agree. <br />MnDOT 6/13/2019 Page 6-33 3 "Bus-Only Shoulders (BOS) allow buses to use the roadway shoulder to bypass <br />automobiles that are in the general flow of traffic. They may only be used when <br />the speed in the regular lanes drops to 30 mph or lower." 30 MPH is incorrect, it <br />should be 35 MPH. <br />X Y <br />Will change. <br />1 General <br />Comment <br />The RMP is referred to as the City’s RMP, the RCWD’s RMP, and the <br />City/RCWD’s RMP throughout the plan. Please revise for consistency and <br />include RCWD in the reference. <br />X Y <br />Will change. (Only 12 Mike says) <br />2 Page 2-4 Lino Lakes <br />RMP/Comprehensi <br />ve Wetland <br />Management Plan <br />2 “Comprehensive Wetland Management Plan” should be revised to <br />“Comprehensive Wetland Protection and Management Plan” to be consistent <br />with the WCA authority and title under which it has been developed.X Y <br />Will change. <br />3 Page 2-4 Natural Resources <br />Revolving Fund <br />Plan <br />3 RCWD is unaware of the City’s 2017 wetland bank study and some of the <br />identified locations on Figure 2-5. Please provide more information or reference <br />to how the potential sites were identified.X N <br />The City will provide a copy of the study. The <br />plan is not pertinent for inclusion in the Comp <br />Plan. <br />4 Page 2-16 Table 2.9 Net Acres/Net Land Area includes “as identified by the Rice Creek Watershed <br />District”, however the inclusion of RCWD is unclear. Please clarify and indicate if <br />the City means as identified by the National Wetland Inventory, RMP, or <br />otherwise. <br />X Y <br />RMP <br /> <br />RCWD 9/16/2019 <br />City of Hugo 7/26/2019