My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-09-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
12-09-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
1/16/2020 10:24:45 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/09/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Community Development\Projects\Capital Improvement Projects\2020 Street Rehabilitation Project\Staff <br />Reports\20191209 CC Authorize Plans & Specs\4. Design Fee Proposal 12-05-19.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM December 5, 2019 <br /> <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Request for Proposal to Complete 2020 Street Rehabilitation Project <br /> <br />Dear Mr. Grochala: <br /> <br />The City of Lino Lakes has an annual street maintenance plan which consists of full <br />depth reclamation, mill and overlay, and seal coating. For calendar year 2020, the City’s <br />projects scope is estimated to cost $998,000. <br />The City of Lino Lakes is requesting assistance with design of its 2020 Street <br />Rehabilitation Project. The streets designated for rehabilitation are local streets as <br />determined by their OCI ratings established in the City’s Pavement Management Study. <br />A summary of the project site is described as follows: <br /> <br />Full Depth Mill and Overlay / Reclamation – Deerwood Lane from Birch Street <br />south to Fox Road, and Fox Road from Deerwood Lane west to West Shadow Lake <br />Drive <br />Thin Overlay – Carl Street from 4th Avenue west 1,400 feet, Rehbein Street, 77th <br />Street, and Gordon Avenue. Bid Alternate* for Olive Street, Eva Street, Orange <br />Street, and Maple Street. <br />Chip Seal, Crack Fill & Striping – City Hall Parking Lot and Town Center Parkway <br />from Lake Drive to YMCA <br />Curb Repair – Town Center Parkway south curb line from Lake Drive to YMCA <br />and east entrance to City Hall parking lot <br /> <br />Project scope includes curb and gutter replacement as necessary, gate valve bolt <br />replacement and investigative water service repair. Based on the project scope, WSB <br />would perform the following tasks: <br /> <br /> <br />I. Prepare Final Project Plans/Maps <br />Final construction plans and/or maps will be prepared indicating the <br />project locations and plan view sheets for reclamation area. Base drawing <br />information will include GSOC design locates, curb inspection, city parcel <br />map information and record plans. Surveyed topographic information has <br />not been included based on project scope. <br /> <br />II. Final Quantities
The URL can be used to link to this page
Your browser does not support the video tag.