Laserfiche WebLink
2. Costs for public park improvements and trail construction will be credited from the total <br />payment in lieu. <br />3. Improvements to the private parks and recreational center will not be credited from the <br />total payment in lieu. <br />In the 3rd Addition, an 8.5 ft wide bituminous trail will be constructed 1,2001f along the eastern <br />berm. A Permanent Trail Easement was recorded in March 2019 that includes this trail section. <br />A 10 ft wide bituminous trail will be constructed 1,000 if along CSAH 54 (20d' Avenue) within <br />Outlot A. A Permanent Trail Easement with Description Sketch has been drafted; however, there <br />is a trail section from the townhome neighborhood to the south property line that needs to be <br />included in the easement and Trail Construction Plan Sheet 27. <br />Park dedication fees will also be credited for the private park land platted as Watermark, Outlot <br />K and Outlot I. These are the private parks in the Discovery neighborhood near Crane Drive and <br />the tot lot in the townhome neighborhood. Per the Master Developer Agreement (MDA), the <br />park dedication fees are based on an appraisal of fair market value. An appraisal was prepared in <br />December 2018 by Insight Realty Advisors, Inc. and forwarded to Lennar for their review. The <br />final values will be reflected in the Council staff report and 3rd Addition Development <br />Agreement. <br />Lennar stated the tot lot and play equipment in the townhome neighborhood will be developed in <br />2020. Per Resolution No. 16-51, credit will not be given for theses private park improvements. <br />The 3rd Addition Landscape Plans shall include details from the Overall Landscape Plan <br />detailing the tot lot site plan, landscaping and equipment. <br />The following is a preliminary summary of the land dedication and fees: <br />Watermark 3rd Addition <br />Total # Units <br />175 <br />x Park Dedication Fee <br />$3,150 <br />Cash in Lieu Value <br />$551,250 <br />- Land dedication value <br />TBD <br />- Trail Construction Costs <br />($39,000) <br />TOTAL CASH FEE DUE = <br />j TBD <br />Wetlands <br />Wetland delineations were approved by RCWD and USACE in 2015. The delineation identified <br />28 wetlands totaling approximately 20 acres in size. The original approved WCA Sequencing <br />2 <br />