My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/11/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
03/11/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:26:59 PM
Creation date
3/6/2020 8:34:06 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/11/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application proposed wetland impacts, wetland creation, wetland restoration and upland buffer <br />establishment. In April 2018, the developer revised the application to purchase 3.3671 acres of <br />wetland banking credits as the proposed compensatory mitigation action. The wetland fill, <br />impacts and mitigation (wetland bank credits) occurred within the Phase I grading limits and are <br />complete. <br />The establishment of the greenway corridor including wetlands, trails and open space on the <br />north end of the Watermark development is a critical component of the project and will be <br />developed in future phases. The Master Development Agreement details the timing, <br />establishment and management of that corridor. <br />An Open Space Easement has been dedicated over outlots containing wetlands, open space, <br />stormwater ponds, berms etc. The Watermark 3rd Addition Final Landscape Plan details the <br />location of required "Protected Open Space Area" signs. <br />A Conservation Easement and Declaration establishing wetland buffer (both favor of RCWD) <br />have been recorded over Wetland 17 (Outlot G, Preliminary Plat) as required by RCWD. When <br />the lots abutting this buffer are graded in the future, these signs will be located along the rear lots <br />lines. <br />Development Agreement <br />Master Development Agreement <br />A Master Development Agreement was recorded in March 2019. The Agreement covers the <br />entire 372 acre site and details the terms and conditions of City approvals, the Development <br />Plans, the required public and private improvements as part of the first and subsequent phase, the <br />standards for the timing and financing of the improvements, required HOA documents and the <br />terms of payment. <br />Development Agreement and Planned Unit Development Agreement <br />The City will also require our standard Development Agreement specific to each phase of <br />development. This agreement further details required improvements and securities. The City <br />Engineer will draft this Agreement and it shall be approved by the City Council. <br />Homeowner's Association (HOA) <br />Prior to release of the final plat mylars, Lennar shall submit to the City the applicable HOA <br />documents and annexation amendments. The City Attorney shall review and comment prior to <br />recording. <br />Title Commitment <br />The City Attorney is reviewing the title commitment and final plat. Any comments shall be <br />addressed prior to release of the mylars. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.