My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/11/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
03/11/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:26:59 PM
Creation date
3/6/2020 8:34:06 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/11/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />0 <br />0 <br />0 <br />z <br />W <br />m <br />U) <br />0 <br />a <br />00 <br />04 <br />N <br />CD <br />LO <br />0 <br />0 <br />N <br />W <br />Z) <br />W <br />W <br />af <br />F- <br />U) <br />M <br />W <br />00 <br />wsb <br />Memorandum <br />To: Katie Larsen, City Planner, City of Lino Lakes <br />From: Kelsey Gelhar, WSB and Associates <br />Diane Hankee PE, City Engineer, City of Lino Lakes <br />Date: March 4, 2020 <br />Re: Watermark 3rd Addition <br />Construction Plan Review <br />15628-000 <br />WSB has reviewed the Construction Plans for the Watermark 3rd Addition in Lino Lakes, MN, <br />prepared by Carlson McCain revision date January 10, 2020. The following are our review <br />comments that should be responded to in writing by the applicant. <br />Engineering <br />Please update the standard plates and details with the 2020 updated city standard plates sent to <br />Carlson McCain on February 26, 2020. <br />• Grading <br />The Watermark 3rd Addition includes site grading for Crane Drive, Itasca Circle, Johanna <br />Circle, Watermark Way, Bay Drive, Ada Drive, Jasper Court, Gull Drive, Island Court, and <br />Heron Court, as well as the grading required for trail construction. <br />Comments: <br />1. Rear yards with less than 2% grade between Johanna Circle and Itasca Circle <br />have not been updated in the latest grading plans revised December 13, 2019. <br />These areas were identified in the WM GRDRC 4-29-19 PDF. <br />• Stormwater Management <br />Stormwater management for the Watermark 3rd Addition has a storm sewer conveyance <br />system, including rear yard drainage systems. <br />Comments: <br />1. The City of Lino Lakes does not allow 12-inch diameter RCP. <br />2. FES 138 to CBMH134: Pipe velocity exceeds MnDOT recommended <br />maximum velocity. Reduce slope and consider a drop inlet manhole instead <br />of FES at 138 outlet. <br />3. Confirm that the culvert extension in Outlet A is being installed with 2nd <br />Addition. If so, show the culvert as existing on the 3rd Addition plans. <br />4. Please revise the storm sewer along Watermark Way at the intersections of <br />Johanna Circle and Itasca Circle to its original design. <br />5. Resubmit water reuse system design and construction plans for review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.