My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
04/08/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:23:51 PM
Creation date
4/3/2020 1:57:11 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/08/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Therefore, it is in the best interests of the public health, safety and welfare to provide for <br />the wise subdivision, use and development of shorelands of public waters. <br />As discussed, the site is located in a Shoreland Management Overlay district of Reshanau <br />Lake. This lake is a classified as a Recreational Development Lake and has an 883.5 <br />OHWL elevation. The required OHWL setback for both Lot 1 and Lot 2 is 75 feet for <br />sewered lots. The proposed setback on Lot 1 is 87.6 feet and is compliant. The current <br />setback from the existing house on Lot 2 is 73.5 feet. The house is considered legal non- <br />conforming. <br />Per Section 1102.87(1)(c)4, impervious surface coverage on each lot must not exceed <br />30%. Sheet 2, Preliminary Plat notes impervious surface coverage for Lot 1 = 18.0% and <br />Lot 2 = 19.8%. Both meet the allowed 30% impervious surface coverage of the <br />shoreland ordinance. <br />A native vegetated shoreline buffer is provided as a stormwater management best <br />management practice (BMP) to minimize runoff pollutants from entering the lake. An <br />average 20 foot wide drainage and utility easement is dedicated on the plat along the <br />shoreline to create and protect the buffer. <br />Impervious Surface Coverage <br />Per the Site Drainage Narrative prepared by Plow Engineering, Inc. dated September 13, <br />2019, the overall total site impervious surface coverage is as follows: <br />Impervious Surface Coverage <br />Total Parcel Size <br />0.98 acres <br />Existing Impervious <br />0.16 acres (16%) <br />Proposed Impervious <br />0.20 acres (21 %) <br />Comprehensive Plan <br />Stern Addition is consistent with the goals and policies of the comprehensive plan in <br />regards to resource management, land use, housing, transportation and utilities as detailed <br />with approval of the preliminary plat. <br />Density and Land Area Calculations <br />The following chart implements Met Council's formula for calculating net density. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.