Laserfiche WebLink
• Hardwood Creek <br />Additional information can be found in Appendix B which contains an updated analysis of <br />stormwater management for the study area. <br />ii. Groundwater— aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project <br />is within a MDH wellhead protection area; 3) identification of any onsite and/or nearby <br />wells, including unique numbers and well logs if available. If there are no wells known <br />on site or nearby, explain the methodology used to determine this. <br />As indicated in the original AUAR, the study area has shallow groundwater. Additional <br />information about groundwater can be found in Appendix C. <br />b. Describe effects from project activities on water resources and measures to minimize or <br />mitigate the effects in Item b.i. through Item b.iv. below. <br />Wastewater — For each of the following, describe the sources, quantities and <br />composition of all sanitary, municipal/domestic and industrial wastewater <br />produced or treated at the site. <br />1) If the wastewater discharge is to a publicly owned treatment facility, identify <br />any pretreatment measures and the ability of the facility to handle the added <br />water and waste loadings, including any effects on, or required expansion of, <br />municipal wastewater infrastructure. <br />2) If the wastewater discharge is to a subsurface sewage treatment systems <br />(SSTS), describe the system used, the design flow, and suitability of site <br />conditions for such a system. <br />3) If the wastewater discharge is to surface water, identify the wastewater <br />treatment methods and identify discharge points and proposed effluent <br />limitations to mitigate impacts. Discuss any effects to surface or groundwater <br />from wastewater discharges. <br />Updated analysis on the wastewater system can be found in Appendix D. <br />Stormwater — Describe the quantity and quality of stormwater runoff at the site <br />prior to and post construction. Include the routes and receiving water bodies for <br />runoff from the site (major downstream water bodies as well as the immediate <br />receiving waters). Discuss any environmental effects from stormwater discharges. <br />Describe stormwater pollution prevention plans including temporary and <br />permanent runoff controls and potential BMP site locations to manage or treat <br />stormwater runoff. Identify specific erosion control, sedimentation control or <br />stabilization measures to address soil limitations during and after project <br />construction. <br />Updated analysis on the stormwater impacts system can be found in Appendix B. <br />iii. Water appropriation — Describe if the project proposes to appropriate surface or <br />groundwater (including dewatering). Describe the source, quantity, duration, use, <br />and purpose of the water use and if a DNR water appropriation permit is required. <br />Describe any well abandonment. If connecting to an existing municipal water <br />supply, identify the wells to be used as a water source and any effects on, or <br />required expansion of, municipal water infrastructure. Discuss environmental <br />effects from water appropriation, including an assessment of the water resources <br />available for appropriation. Identify any measures to avoid, minimize, or mitigate <br />environmental effects from the water appropriation. <br />Updated analysis on water system impacts can be found in Appendix C. <br />1-35E Corridor AUAR Update <br />April 15, 2020 <br />Page 6 <br />