My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/29/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
04/29/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:57:26 PM
Creation date
4/24/2020 11:18:56 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/29/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br />April 8, 2020 <br />Page 6 <br />Review and Update of the Mitigation Plan <br />The table below provides the mitigation plan for Transportation. These mitigation measures have been reviewed and revised as needed for <br />this AUAR Update. <br />Table 7. Transportation <br />Item No. <br />Mitigation Description <br />Update <br />21.1 <br />Create a monitoring program that closely evaluates traffic impacts from proposed <br />Traffic Impact Studies are required for <br />developments within the AUAR area. <br />proposed developments showing the <br />impact on the transportation system and <br />consistenc with the AUAR. <br />21.2 <br />Implement traffic mitigation measures as development occurs within the AUAR <br />CSAH 14 improvement was completed in <br />area. Specific mitigation measures for the three development scenarios are <br />2009 and noted in the 2010 AUAR <br />discussed in Item 21 and depicted on Figures 21-8, 21-9, and 21-10. These <br />Update <br />mitigation measures improve overall traffic operations for the respective <br />development scenarios. The improvements are intended to represent the <br />CSAH 54 with CSAH 14 (formerly CSAH <br />minimum level of infrastructure investment that would be needed to meet <br />21) 20th Avenue North intersection <br />acceptable level of service standards. Additional roadway and non -motorized <br />improvements were completed and <br />improvements, beyond the minimum level, may be identified to accommodate <br />noted in the 2010 AUAR Update. <br />specific development needs that are identified within the AUAR area. Primary <br />improvements, regardless of land use scenario, include: <br />1-35E Interchange reconstruction was <br />completed in 2011. This mitigation <br />21.2.1 Develop frontage road system in compliance with local, county and state <br />measure is complete. <br />access management guidelines to serve local and regional traffic. <br />21.2.2 Work with appropriate road authorities to reconstruct and provide <br />additional capacity for CSAH 21. <br />21.2.3 Work with appropriate road authorities to construct Northerly Bypass <br />with new interchanges at 1-35W and 1-35E (80th Street East) to improve traffic <br />operations and access to and within the AUAR area. As recommended by <br />FHWA and Mn/DOT, a phasing plan should be established to construct each <br />piece of the Northerly Connector as it becomes necessary to maintain the <br />serviceability of the transportation system. <br />KA015144-000\Admin\DOCSWUAR -Update 2020\Traffic\MEMO - 040820 - Transportation.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.