My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/29/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
04/29/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:57:26 PM
Creation date
4/24/2020 11:18:56 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/29/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br />April 8, 2020 <br />Page 7 <br />Item No. <br />Mitigation Description <br />Update <br />Phase Improvement <br />�GtiGR) <br />GGRStr� <br />2. GS ^ urn i-35 E inteFGhange <br />3. CR 140 (801h Street)/1-35E Interchange <br />4. CSAH 14 across Peltier Lake (Northerly <br />Bypass/Connector) <br />5. CSAH 14/1-35W Interchange <br />As part of these improvements, the following steps should be taken as the <br />opportunity is presented: <br />■ Inclusion of the northerly bypass and proposed interchanges in future <br />transportation and comprehensive plans <br />■ Preservation of right of way through official mapping or other process <br />■ Right of way dedication through the platting process <br />21.3 <br />Require a traffic impact analysis for all development projects within the AUAR <br />This mitigation measure is ongoing. <br />area. The traffic impact analysis will assist the City and other road authorities in <br />determining the appropriate mitigation measures that are required to mitigate <br />impacts of a specific development proposal. <br />21.4 <br />Work with appropriate road authorities to mitigate the impact of the additional <br />This mitigation measure is ongoing. <br />traffic on the on the regional system, specifically Interstates 35W and 35E, by <br />reconstructing each to provide a six -lane cross-section consistent with the <br />recommendations outlined in the 1-35 IRC. It should be noted that it was <br />determined that an expansion will be necessary even without the development <br />scenarios used in this analysis. As the interstates serve a much larger area, the <br />projected growth of the entire Twin Cities region should warrant expansion by <br />the year 2030. <br />21.5 <br />Prioritize alternative travel modes within the AUAR study area and require <br />This mitigation measure is ongoing. <br />project proposers to address alternative travel modes (e.g., buses, bicyclists, <br />and pedestrians) by identifying appropriate accommodations. <br />KA015144-000\Admin\DOCSWUAR -Update 2020\Traffic\MEMO - 040820 - Transportation.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.