My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/29/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
04/29/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:57:26 PM
Creation date
4/24/2020 11:18:56 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/29/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 19. SOIL AND GROUNDWATER CONTAMINATION <br />Item No. <br />Mitigation Description <br />Update <br />19.1 <br />Require the removal of all tanks and associated underground piping in <br />This mitigation measure is ongoing. <br />accordance with applicable state and federal laws. <br />19.2 <br />Require that any party that may discover residual petroleum <br />This mitigation measure is ongoing. <br />contamination shall follow state law and report the information to the <br />MPCA for further investigation and potential remediation. <br />ITEM 21. TRANSPORTATION <br />Item No. <br />Mitigation Description <br />Update <br />21.1 <br />Create a monitoring program that closely evaluates traffic impacts from <br />Traffic Impact Studies are required for proposed <br />proposed developments within the AUAR area. <br />developments showing the impact on the <br />transportation system and consistency with the <br />AUAR. <br />21.2 <br />Implement traffic mitigation measures as development occurs within the <br />CSAH 14 improvement was completed in 2009 and <br />AUAR area. Specific mitigation measures for the three development <br />noted in the 2010 AUAR Update <br />scenarios are discussed in Item 21 and depicted on Figures 21-8, 21-9, <br />and 21-10. These mitigation measures improve overall traffic operations <br />CSAH 54 (formerly CSAH 21) 20th Avenue North <br />for the respective development scenarios. The improvements are <br />intersection improvements were completed and <br />intended to represent the minimum level of infrastructure investment that <br />noted in the 2010 AUAR Update. <br />would be needed to meet acceptable level of service standards. Additional <br />roadway and non -motorized improvements, beyond the minimum level, <br />1-35E Interchange reconstruction was completed in <br />may be identified to accommodate specific development needs that are <br />2011. This mitigation measure is complete. <br />identified within the AUAR area. Primary improvements, regardless of land <br />use scenario, include: <br />21.2.1 Develop frontage road system in compliance with local, county, <br />and state access management guidelines to serve local and regional <br />traffic. <br />21.2.2 Work with appropriate road authorities to reconstruct and provide <br />additional capacity for CSAH 21. <br />Mitigation Plan Update — 2020 January 31, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.