My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/10/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
06/10/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:06:20 PM
Creation date
6/5/2020 2:52:18 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/10/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />06/03/2020 <br />Page 9 <br />Comments: <br />1. The City's ordinance requires a 30 foot clear zone at intersections. In addition the applicant <br />shall provide a clear (no vegetation or other) triangular sight line of 100 feet at intersections <br />with County roadways. <br />30' sight lines will be provided for City road intersections. light triangles at County roads will <br />be coordinated and verified with Anoka County. <br />This will be reviewed when turn lanes plans are finalized. <br />The applicant shall adjust proposed tree locations to accommodate a maintenance access <br />route to the pond overflow structure. <br />Maintenance route access to the overflow access is being defined by Civil Engineers and a <br />clear route has been provided. <br />Shrubs still shown in area designated as maintenance access route. <br />Landscaping being reviewed by City of Lino Lakes Environmental Coordinator. <br />Staff recommends that no trees are planted on top of storm sewer pipes or other utilities. <br />• Geotechnical <br />A geotechnical report was completed by Braun Intertec for the proposed Lyngblomsten development. <br />See PDF named "3.27.20 Letter to Diane Hankee" for additional geotechnical evaluation. <br />• Floodplain <br />Floodplain is not present on this site. <br />• Drainage and Utility Easements <br />Comments: <br />1. <br />n.n +ho r orlh+ili+ioc <br />Plono hAy,= been panted accordingly <br />The plan set shall show the storm sewer plan view and easement lines on the same <br />page. This will allow the City to verify all storm and utility easements are correct. <br />See sheet C1.41, Utility Easement Plan. <br />• Development Agreement <br />A development agreement is required with the final plat. <br />• Grading Agreement <br />Not applicable at this time. <br />• Stormwater Maintenance Agreement <br />A stormwater maintenance declaration will be required with the final plat. <br />• Permits Required <br />City of Lino Lakes Zoning Permit for grading <br />NPDES General Construction Permit <br />Lyngblomsten Preliminary Plat Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.