My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/10/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
06/10/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:06:20 PM
Creation date
6/5/2020 2:52:18 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/10/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Current Zoning <br />LI, Light Industrial <br />Current Land Use <br />Industrial <br />Future Land Use per CP <br />Industrial <br />Utility Staging Area <br />1A=2008-2015 <br />Surrounding Zoning and Land Use <br />Direction <br />Zoning <br />Current Land Use <br />Future Land Use <br />North <br />GB, General <br />Vacant Commercial <br />Commercial <br />Business <br />PUD, Planned <br />Residential Townhomes <br />East <br />Unit <br />(Victor Gardens, <br />Mixed Use <br />Development <br />City of Hugo) <br />South <br />LI, Light <br />Vacant Industrial <br />Industrial <br />Industrial <br />West <br />LI, Light <br />Industrial <br />Industrial <br />Industrial <br />Site and Building Plan Review <br />Site Plan <br />The site plan proposes a second, stand-alone 37,284 sf training facility being constructed <br />to the east of the existing facility. The new facility will be constructed in 2 phases. <br />Phase 1 is approximately 24,977 sf and Phase 2 is 12,307 sf. There is no dedicated <br />timeline for the Phase 2 construction. All utilities and parking lots will be constructed in <br />Phase 1. A west storm water pond south of the exiting parking lot and an east pond south <br />of the new facility are proposed. A new 91 stall parking lot south of the existing building <br />will connect with the existing parking lot and a new driveway will ingress/egress to the <br />east at the current driveway location. <br />A Site Plan Review Worksheet detailing setbacks and performance standards has been <br />completed. Overall, the proposed campus expansion and parking lot meet setback and <br />performance standard requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.