Laserfiche WebLink
Ms. Katie Larsen <br />8/1/19 <br />Page 3 <br />4. Prior to the issuance of the Certificate of Occupancy, a FEMA approved LOMR-F is required. <br />Note FEMA review time lines should be considered when considering closing dates. <br />nl.no...lo!lnoMfQAt form <br />6. The floodplain exhibit shall be edited or a new version showing the BFE, fill area, and <br />mitigation area. <br />7. The applicant shall provide earthwork calculations to clearly demonstrate that 110 cubic yards <br />of compensatory floodplain storage is being created. <br />8. The LAG shall be updated to include a future deck and the floodplain mitigation area <br />updated. <br />9. Accessory structures will need to meet floodplain regulations and are currently not included as <br />part of this mitigation plan. <br />10. The applicant shall verify FEMA floodplain setback requirements from structures. <br />11. CLOMR-F Application was reviewed and the following comments are provided for the <br />applicant's consideration prior to submitting to FEMA: <br />a Clods+inn Como Q eStinn'1 shall -he ansi.yered. <br />h Clods+inn Como (L 1e6tieR(B droll he answered <br />c. Lowest Lot Elevation should be "lowest elevation of a legally recorded property as <br />defined by a metes and bounds description" Provide elevation to the nearest tenth of <br />a foot. <br />d Lowest est AdjaG8nf (-`Fade M -st be the oleyatinn form <br />12. The mitigation volume shall be revised prior to signing the Community Acknowledgement form. <br />The mitigation volume will also need to be approved by RCWD. <br />• Drainage and Utility Easements <br />Standard drainage and utility easements apply and are not all currently shown. <br />Comments: <br />1. The applicant shall show standard side yard drainage and utility easements. <br />2. The applicant shall include drainage and utility easement over the wetlands, buffer area, and <br />floodplain mitigation area. <br />• Development Agreement <br />A development agreement will be required with the final plat. <br />• Stormwater Maintenance Agreement <br />This stormwater maintenance of this subdivision will be covered under the City's Programmatic <br />Maintenance Agreement. <br />• Permits Required <br />1. City of Lino Lakes Zoning Permit for construction <br />2. Rice Creek Watershed Permit <br />If you or the applicant have any questions regarding these comments, please contact Diane Hankee at (651) <br />982-2430 or dhankee@linolakes.us. <br />S:\Community Development\Projects\Planning Cases\Poehling Addition (6790 W Shadow Lake)\Staff Reports\20200708 <br />PZ (FP)\a1 20200701 Engineering Review -Poehling Addition Final Plat.docx <br />