Laserfiche WebLink
Wetlands <br />The PUD concept plan indicates 34.61 acres of wetlands and buffers on site. The buffers <br />are shown as 20 ft wide. Both RCWD and VLAWMO are the local governing units <br />(LGU) for administering the Wetland Conservation Act (WCA). NorthPointe 5tn <br />Addition Outlot A is in RCWD. The balance of the site is in VLAWMO. <br />Staff Comments: <br />• A wetland delineation report and VLAWMO and RCWD approval shall be <br />required with a PUD Development Stage Plan/Preliminary Plat submittal. <br />• Wetland buffers consistent with RCWD regulations (50 ft wide average, <br />monument signs etc.) may be required as part of the PUD. <br />• Wetland restoration may be required as part of the PUD. <br />Floodplain <br />The FEMA Floodplain Map indicates Zone A flood plain on the subject property. <br />Staff Comments: <br />• A Base Flood Elevation is required to be determined, using detailed methods <br />acceptable by the Federal Emergency Management Agency (FEMA). <br />• A FEMA CLOMR and LOMR are required for this site. <br />• The CLOMR shall be submitted with a PUD Development Stage Plan application. <br />Shoreland District <br />The subject property is not located within the Shoreland Management Overlay District. <br />Additional Comments <br />The PUD Concept Plan has been sent to Anoka County Highway Department and Lino <br />Lakes Public Safety for review and comment. At the time of this staff report, comments <br />have not yet been received. Any comments received will be shared with the Board and <br />Council. <br />Environmental Board Comments <br />The Environmental Board reviewed the PUD concept plan on August 26, 2020. General <br />comments included the need for wetland restoration, buffers, stormwater management <br />and noise study. <br />I <br />