My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/09/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
09/09/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:17:03 PM
Creation date
9/3/2020 2:28:30 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/09/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Outlot A, NorthPointe 5th Addition is located in Utility Staging Area 1 A (2018-2025). <br />Two of the 3 Burque parcels are in Utility Staging Area 1B (2025-2030). The 3rd Burque <br />parcel is in Utility Staging Area 3 (Post 2040). <br />Municipal water and sanitary sewer utilities to serve the Burque development exist along <br />Cypress Street and Chestnut Street in NorthPointe. <br />Staff Comments: <br />• Per the City Engineer, sanitary sewer to serve this development shall come from <br />Cypress Street. The sewer line in Chestnut Street does not have enough depth to <br />serve the proposed development. <br />• A comprehensive plan amendment to move from Utility Staging Area 3 to IA is <br />required. <br />Parks, Greenways and Trail Plan <br />Per the draft 2040 Parks, Greenways and Trails Plan, this development is within the <br />NorthPointe Park service area. No future land dedication or park development is <br />required. A greenway corridor exists along the wetland and ditch. A proposed trail is <br />shown on the plan extending from the existing trail on Chestnut Street to Birch Street. A <br />proposed on -street bike route is shown along CSAH 54 (20th Avenue). <br />The City will require cash in lieu of land dedication. Any required trail construction <br />costs will be credited from the total payment in lieu. <br />Staff Comment: <br />• Additional trails along the wetland corridor shall be evaluated. <br />Tree Preservation and Landscaping <br />A Tree Preservation Plan and Landscape Plan in compliance with Section 1007.043 (17), <br />Required Screening, Landscaping and Buffer Yards shall be submitted. <br />Staff Comment: <br />• Additional landscaping may be required as a condition of the PUD. <br />Environmental Review Record <br />An Environmental Assessment Worksheet (EAW) is not warranted. The threshold <br />computation of unattached units (102) and attached units (50) is less than one. <br />The majority of the site is outside the I-35E AUAR Corridor. Outlot A in NorthPointe is <br />within the AUAR and was evaluated as part of that development. <br />N. <br />
The URL can be used to link to this page
Your browser does not support the video tag.