My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/13/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
01/13/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2021 10:57:58 AM
Creation date
1/8/2021 11:04:02 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/13/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> <br />- Trail Construction Costs ($120,000) <br />TOTAL CASH FEE DUE = ($39,440) <br /> <br />There are 348 remaining lots to be platted. The negative cash balance will be carried over and <br />balanced with the next phase of development. <br /> <br />Wetlands <br /> <br />Wetland delineations were approved by RCWD and USACE in 2015. The delineation identified <br />28 wetlands totaling approximately 20 acres in size. The original approved WCA Sequencing <br />Application proposed wetland impacts, wetland creation, wetland restoration and upland buffer <br />establishment. In April 2018, the developer revised the application to purchase 3.3671 acres of <br />wetland banking credits as the proposed compensatory mitigation action. The wetland fill, <br />impacts and mitigation (wetland bank credits) occurred within the Phase I grading limits and are <br />complete. <br /> <br />In December 2020, the developer submitted another Wetland Replacement Plan to RCWD for <br />the balance of the site. Phase 3 grading impacts 5.9784 acres of wetland which require a 1:1 <br />mitigation. The plan was to buy wetland credits for mitigation; however, viable wetland <br />restoration and creation opportunities exist within Phase 3; therefore, onsite restoration and <br />creation will be used for mitigation. This is consistent with the Parks and Open Space Plan and <br />the establishment of the greenway corridor including wetlands, trails and open space. <br /> <br />An Open Space Easement in favor of the City was recorded in March 2019 over outlots <br />containing wetlands, open space, stormwater po nds, berms etc. Additional easements and <br />declarations in favor of RCWD will be recorded over the wetlands and buffers. The Watermark <br />4th Addition Final Landscape Plan details the location of required “Protected Open Space Area” <br />signs. <br /> <br />Development Agreement <br /> <br />Master Development Agreement <br /> <br />A Master Development Agreement was recorded in March 2019. The Agreement covers the <br />entire 372 acre site and details the terms and conditions of City approvals, the Development <br />Plans, the required public and private improvements as part of the first and subsequent phase, the <br />standards for the timing and financing of the improvements, required HOA documents and the <br />terms of payment. <br /> <br />Development Agreement and Planned Unit Development Agreement <br /> <br />The City will also require our standard Development Agreement specific to each phase of <br />development. This agreement further details required improvements and securities. The City <br />Engineer will draft this Agreement and it shall be approved by the City Council.
The URL can be used to link to this page
Your browser does not support the video tag.