Laserfiche WebLink
CONSTRUCTION <br />ACCESS ROAD <br />CLEAN <br />4:1 MAX. SLOPES <br />OUT STORM <br />SEWER <br />POND EXCAVATION SITE <br />NOTE: EXCAVATION CONTOURS SHOWN ARE APPROXIMATE — ELEVATION DATUM ASSUMED. <br />EARTHWORK QUANTITIES ARE APPROXIMATE, BASED ON 2 FOOT AVERAGE CUT. <br />PROJECT DESCRIPTION: <br />1. INSTALL CONSTRUCTION MATS AS NEEDED FOR ACCESS TO PROJECT AREA. <br />2. REMOVE/TRIM TREES AS DIRECTED TO ACCESS FES/POND (PROPERTY OF CONTRACTOR) <br />3. EXCAVATE APPROX. 500 CY POND SEDIMENT (LEVEL 1, PROPERTY OF CONTRACTOR) <br />4. CLEAN OUT STORM SEWER INFRASTRUCTURE. <br />5. RESTORE DISTURBED LAWN AREAS WITH SOD. <br />6. RESTORE DISTURBED NON —TURF AREAS WITH TOPSOIL, SEED(33-261), <br />FERTILIZER AND CAT. 3N EROSION BLANKET. <br />NOTE: COST TO INCLUDE ALL MATERIALS, LABOR AND REQUIRED EROSION CONTROL BMP'S <br />TO PERFORM THE DESCRIBED REPAIR WORK. <br />0 FT <br />40 <br />80 <br />wsb <br />701 Xenia Avenue South, Suite 300 <br />Minneapolis, MN 55416 <br />www.wsbeng.com <br />763-541-4800 - Fax 763-541-1700 <br />SITE 1 <br />6998 BLACK DUCK DRIVE <br />POND MAINTENANCE - SEDIMENT REMOVAL <br />2020 SURFACE WATER MAINTENANCE PROJECT <br />WSB Project No. R-015935 <br />CITY' 'OF <br />LNOL KES� <br />