Laserfiche WebLink
STAFF ORIGINATOR: <br />MEETING DATE: <br />TOPIC: <br />VOTE REQUIRED: <br />INTRODUCTION <br />CITY COUNCIL <br />AGENDA ITEM 6B <br />Diane Hankee PE, City Engineer <br />February 8, 2021 <br />2021 Street Improvement Project <br />i. Consider Resolution No. 21-07, Accepting bids, <br />Awarding a Construction Contract <br />ii. Consider Resolution No. 21-08, Approving Construction <br />Services Contract with WSB & Associates <br />3/5 <br />Staff is requesting council's consideration to accept bids, award a construction contract, and <br />approve a construction services contract for the 2021 Street Improvement Project. <br />BACKGROUND <br />On December 14, 2020, the City Council ordered the project and authorized the advertisement for <br />bid for the 2021 Street Improvement Projects. The proposed 2021 Street Improvement Project <br />include: <br />Base Bid: <br />Street Reconstruction - <br />Full Depth Reclamation, spot subgrade repairs, and culvert replacements: <br />• 4th Avenue between Main Street and Pine Street <br />• Joyer Lane between Birch Street and Karth Road <br />• Karth Road between Joyer Lane and the cul-de-sac <br />• Talle Lane between Karth Road and Canfield Road <br />• Canfield Road between Talle Lane and Gaage Lane <br />• Gaage Lane between Canfield Road and Birch Street <br />Street Rehabilitation - <br />Full Depth Reclamation, spot curb and gutter and storm sewer repairs: <br />• Forsham Lake Drive between Lake Drive and Stage Coach Trail <br />• Stage Coach Trail from the cul-de-sac to approximately 1,400 feet north <br />• Post Road between Stage Coach Trail and Stage Coach Trail <br />