My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/14/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
04/14/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 12:38:34 PM
Creation date
4/9/2021 11:09:59 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/14/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The private road has been revised from 28ft wide back to back to 32 ft wide back to back. <br /> An additional 60 ft of road right-of-way is being dedicated along Otter Lake Road and <br /> over a 35 ft wide strip that was acquired by the City in 2013 for the purpose of <br /> constructing Otter Lake Road. <br /> Similar to Main Street Shoppes, a Declaration of Access Control has been drafted. The <br /> Declaration states the private access road to the development will have full access to <br /> Otter Lake Road upon completion, but such full access must be reduced to right-in, right- <br /> out access upon further extension of the Otter Lake Road to the north. <br /> Staff notes the private road will eventually extend north to serve future development and <br /> connect to the future full access at Otter Lake Road. Previous wetland impact concerns <br /> related to the future road extension have been eliminated because the wetland is being <br /> mitigated in accordance to WCA Notice of Decision issued January 27, 2021. <br /> Easements <br /> Standard drainage and utility easements at least 10 feet wide have been provided along <br /> the lot lines of Lot 1, Block 1. A drainage and utility easement is also provided over the <br /> private road, stormwater pond facilities and wetland. An easement will not be required <br /> over the northern wetland since it is anticipated this wetland will be impacted and <br /> mitigated in the future. An easement may be required at that time. <br /> Previously recorded highway easements and utility easements along CSAH 14 (Main <br /> Street) exist on site. <br /> Public Land Dedication <br /> An 8.5 ft wide bituminous trail approximately 3001f will be constructed along the west <br /> side of Otter Lake Road. The public trail will be installed by the developer and <br /> maintained by the City. <br /> The City will credit a cash fee of$2,520 per acre minus trail construction costs in lieu of <br /> land dedication for commercial development for Lot 1, Block 1, Otter Crossing. <br /> Otter Crossing <br /> 1.46 acres x $2,520 per acre= $3,679.20 <br /> - Trail Construction Costs = $9,113.50 <br /> TOTAL = ($5,434.30) <br /> The negative cash balance will be carried over and balanced with future phases of <br /> development. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.