Laserfiche WebLink
8 <br />Alternative Urban Areawide Review (AUAR) <br /> <br />The site is not within the 2005 I-35E Corridor AUAR; therefore, no mitigation is <br />required. <br /> <br />Traffic Study <br /> <br />A Traffic Study was prepared by Spack Solutions on December 6, 2019 and reviewed <br />during the preliminary plat process. It was determined that Nadeau Acres meets <br />transportation guidelines in regards to traffic volume, traffic capacity and level of service. <br /> <br />Wetlands <br /> <br />Kjolhaug Environmental Services Company, Inc. prepared a Wetland Delineation Report <br />dated October 29, 2019. A Notice of Decision was issued by RCWD on December 11, <br />2019. <br /> <br />Kjolhaug Environmental Services Company, Inc. prepared a Wetland Permit Application <br />dated December 23, 2019. Per the report, two (2) wetlands were delineated on site <br />totaling 1.37 acres. Wetland 1 is a Type 1 wet meadow wetland. Wetland 2 is a <br />partially-drained, wet meadow and scrub-shrub wetland. A portion of Wetland 2 <br />southwest of the septic mound discharge outlet was created in upland and is incidental. <br /> <br />The proposed project will require 30,826 square feet (sf) (0.7076 acre) of permanent <br />impact to four (4) wetland areas, one of which is incidental for WCA permitting. <br />Replacement will be accomplished via the purchase of wetland banking credits. <br /> <br />The site is inside of the boundaries of the Lino Lakes Comprehensive Wetland Protection <br />and Management Plan (CWPMP) area; however, onsite wetlands do not fall within the <br />landscape scale/preliminary Wetland Management Corridor (WMC). Therefore, no <br />WMC buffer on wetlands is required with site development. <br /> <br />Rare & Endangered Species <br /> <br />Per the December 12, 2019 report prepared by Midwest Natural Resources, no habitats for <br />state-listed plant species were observed during field review. No further surveys are <br />recommended. <br />Floodplain <br /> <br />There is no FEMA floodplain on site. <br /> <br />Development Agreement <br /> <br />A Development Agreement will be drafted by the City and shall be executed and <br />recorded by the developer. <br />