My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-07-1982 Park Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Minutes
>
1982 Minutes
>
09-07-1982 Park Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:36:19 PM
Creation date
6/4/2021 9:14:39 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Minutes
Meeting Date
09/07/1982
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Board <br /> September 7, 1982 <br /> Page Two <br /> There was discussion on the possibility that the access road may need <br /> to be relocated. The depth of the lake and possible problems in dealing <br /> with this problems was also discussed. <br /> Mr. Lindy had arrived. <br /> There was a motion (could not hear who made the motion) to approve the <br /> following development plan for Country Lakes Park <br /> Phase I - BEACH AREA <br /> a) Lake Development <br /> b) Construction of Beach Area <br /> c) Construction of connecting Trail System <br /> Phase II - ACCESS ROAD - PARKING FACILITIES <br /> a) Access Road <br /> b) Parking Lot A <br /> c) Parking Lot B <br /> d) Parking Lot C <br /> PHASE III - CONSTRUCTION OF BATH HOUSE <br /> a) Drill water well <br /> b) Construct Septic system <br /> c) prepare footing and pour slab <br /> d) Construct building <br /> PHASE IV - FISHING & PICNIC AREA <br /> a) Lake Development <br /> b) Picnic Area <br /> c) Trail system <br /> PHASE V- BOAR LAUNCH FACILITY <br /> a) Lake Development <br /> b) Access Facility <br /> c) Trailer Parking Lot <br /> Mr. Scherer moved to approve the above schedule of development . <br /> Seconded by Mr. Flannery . Motion carried unanimously . <br /> Mr. Flannery moved to recommend a feasibility report on all phases of <br /> the development of the park. Seconded by Mr. Arntzen . Motion carried <br /> unanimously . <br /> There was discussion on the construction of the bathhouse - design , <br /> materias , changing areas need, interior facilities needed , etc. There <br /> was suggestion that Mr . Schumacher discuss this with an architect - <br /> just the basics to determine the size of a building with an estimated <br /> cost . This would give the Park Board some place to start . Mr. Arntzen <br /> and Mr. Lindy were appointed to work with the architect from Hugo on <br /> this matter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.