Laserfiche WebLink
n SEPTEMBER 15, 1975 <br /> Mrs. LeTourneau LeTourneau asked if a 4" well would be adequate for current and <br /> future needs of this City. Mr. McGeary wanted to know if the crews <br /> were pumping the wells dry and at what rate. <br /> The problem with pumping is that the wells would be dry after approximately <br /> .4 : 15 minutes of pumping time and in the case of the Hall Park, the water <br /> and toilet facilities could not be used in the Hall while flooding was <br /> being done. There was no pressure at all . <br /> From all information available at this time a 4" well with a 50 gallon <br /> per minute capacity would adequate take care of the needs now and in <br /> the future. <br /> After more discussion, Mr. Karth moved to recommend to the City Council <br /> that the Sunrise Park Well be repaired and/or replaced to pump with a <br /> capacity of 50 gallons per minute and with some action taken on this <br /> matter within the next thirty days. Mr. Hanson seconded the motion. <br /> Motion carried. <br /> The well at the Hall Park was discussed next and the same conclusions <br /> were arrived at: the well needs to be repaired or replaced and Mr. Karth <br /> offered the following motion: The Park Commission recommend to the City <br /> Council that the Hall Park well be repaired and/or replaced to pump with a <br /> capacity of 50 gallons per minute and with some action taken on this <br /> matter within the next thrity days. Mrs. LeTourneau seconded the motion <br /> and the motion passed. <br /> Mr. Karth then presented an informal bid he had obtained for the <br /> proposed warming house at the Hall Park. (A wpy of this bid is attached <br /> to the minutes.) The proposed building would be 24 x 24 with 16 course <br /> block walls, Gable roof with a one foot overhang., G" full thick insulation <br /> ceiling, masonary fill insulation walls. The bid does not Include painting <br /> or a septic system. Total cost per this bid would be $9,706.00 if built <br /> according to specs furnished. <br /> Mr. Karth said that they took the specs from Mr. Gotwald's letters earlier <br /> this Spring. <br /> Mrs. LeTourneau wanted to know if there was still time to put this building <br /> up this year. Mr. Karth said that the building contractor said that he <br /> could break ground and rough it In in approximately 11 weeks after the <br /> proposal was accepted by the City. <br /> Mr. McGeary questioned how the septic system would be handled. Would this <br /> building require a separate system or could it be somehow tied into the <br /> system now being used by the City Hall . <br /> The Park Commission Members felt that this was an excellent idea and <br /> will ask that steps be taken to determine if this is feasible. <br />