My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-15-1975 Park Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Minutes
>
1975 Minutes
>
09-15-1975 Park Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:36:38 PM
Creation date
6/4/2021 10:51:55 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Minutes
Meeting Date
09/15/1975
Park Bd Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Proposal No. <br /> FROM Gene Baum Builder Sheet No. <br /> Rt. 4, Box. 567 <br /> Forest Lake, Mn. 55025 Date <br /> 464-6858 <br /> Proposal Submitted To Work To Be Performed At <br /> Name Lino Lakes Park Board Street <br /> Street City Lino Lakes State Minn. <br /> City Lino. Lakes Date of Plans <br /> State Minn. Architect <br /> Telephone Number <br /> We hereby propose to furnish all the materials and perform all the labor necessary for the completion of <br /> a 24 s- 24 warming house. 16 course block walls, gable roof with 1 ft. overhang, <br /> 6" full thick insulation ceiling, masonary fill insulation walls. <br /> Plumbing (hot water heater extra) , heating, 60 amp electrical 100 amp service _ <br /> extra) per sketches received from Harvey Karth. <br /> _ _Any specifications on materials will be gladly furnished. <br /> This bid does not include painting or septic system. <br /> Price subject to change according to specs required that were not furnished. <br /> material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings <br /> __.d specifications submitted for above work and completed in a substantial workmanlike manner for the sum of <br /> Dollars ($9,706.00 1• <br /> with payments to be made as follows: <br /> 207. down, 50% of balance upon rough in, remainder upon completion. <br /> Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will <br /> become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our <br /> control. Owner to carry fire, tornado and other necessary insurance upon above work. Workmen's Compensation and Public <br /> Liability Insurance on above work to be taken out by builder. <br /> Respectfully sub fitted GENE BAUM BU L DER <br /> Per Q <br /> Note—This proposal may be withdrawn by us if not accepted within '90 days <br /> ACCEPTANCE OF PROPOSAL <br /> The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as <br /> specified. Payment will be made as outlined above., <br /> ti pted Signature <br /> Date Signature <br /> - <br /> TOPS FORM 3450 • LITHO IN U. S. A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.