Laserfiche WebLink
January 20, 1975 <br /> -2- <br /> For the warming house at the Hall Park It was agreed that concrete block <br /> would probalby be the best construction and the sturdiest dor all purposes. <br /> There will have to be some type of ventilation at the top especially in the <br /> restroom areas. <br /> Mr. Resch suggested glass block windows with the Inset for ventilation <br /> purposes as perhaps the best and the least likely to be vandalized. <br /> r, floor drain wli ! also have to be put in to aid In cleaning and to <br /> r.r-ctecr the buifdIng In case the toilets or sinks get plugged and overflow. <br /> t was suggested that the plans conform somewhat to the freeway rest areas <br /> th-t have been constructed aicng the interstates. <br /> A new pump would have to be put In with adequate pressure for the ;warming <br /> house and for f;ooding at the Hall Park. Mr. Resch stated that he had <br /> c:iecked Into the type of pump needed and felt that one that would produce <br /> 7,000 gallons per hour would be adequate. <br /> ?Bore was a discussion on price range that could be looked at and Mr. McLean <br /> �Avised the Commission to look at design rather than try to figure costs <br /> r !pht now. He baid that after the ideas have been submitted to a draftsman <br /> and the drawings returned, they would be in a better position to talk rp <br /> pel-e. The main thing right now was to determine a size and try to standardized <br /> tax,. layout of the structure as much as possible, so that it could be used <br /> a* all future parks. <br /> T'ie warming houses should be at least 24 x 36 with bathroom facilities at <br /> oro end. The bathrooms should contain 4 stools - 2 each. Some kind of <br /> outBide entrance that could be locked in the winter should be considered. <br /> Mrs.LeTourneau suggested that the Commission keep a multi-purpose building <br /> l- mind, not ,just one that would be utilized during the winter months. <br /> rvA-s . Kendall rem!nded the Commission that a plug-in and bubbler for coffee <br /> s`;ouid be considered In the original plans, because of the great difficulty <br /> { -aking a pot of coffee at Sunrise now. <br /> The matter of heat for the warming house at the Hail Park was also discussed. <br /> Tf�e Hail has gas, forced air heat now and the warming house would probably use <br /> tL, same type. The cost of heating the warming house in minimal , it should <br /> n-.t be kept any warmer that 45-55 degrees. <br /> 1°r. Resch brought up the matter of additional parking at the Hall mark and <br /> s�lggested that a road be put In with access off of Main Street. This Is <br /> u--#ng considered and will be discussed at length at the next meeting. <br /> �i=:fore the next meeting Mr. Resch will do some research on the h^�i iocatlon <br /> 'ter the Warming House at t`-F Mall Park and also a parking area. <br />