My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/05/1994 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1994 Park Board Packets
>
12/05/1994 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 4:01:25 PM
Creation date
6/4/2021 2:41:51 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
12/05/1994
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 12 <br /> What kind of lighting will be used? <br /> If it was determined that lighting was to be used on this site, <br /> the park site would use a directional lighting system that <br /> affords a very minimal, if any spill-over. <br /> Question 13 <br /> What will be the park Hours? <br /> As per City Ordinance 300.07, "No person, except authorized city <br /> personnel, shall be in or remain in any public park or grounds <br /> between the hours of 10:00 P.M. and 7:00 A.M. , except by written <br /> permit issued by the clerk-treasurer, after prior council <br /> approval." <br /> Question 14 <br /> Has the traffic engineer predetermined how many more trips a day <br /> the complex will create? <br /> According to the study report written by the engineering firm, <br /> the traffic to and from the recreation complex was expected to <br /> add approximately 330 trips a day on Holly Drive, and about 1000 <br /> trips a day south of the driveway in the concept plan, and to <br /> County Road J. Trips were estimated on heavy summer use of the <br /> complex. Traffic would be expected to be less during the winter <br /> months. <br /> Question 15 <br /> Will County Road J need to be widened? <br /> A study was completed to determine traffic volumes and what the <br /> roadway design and geometrics should be at various stages of <br /> development along 12th Ave. and Holly Drive. A separate study <br /> would need to be made to done to evaluate future traffic <br /> projections and pavement conditions along County Road J. <br /> Question 16 <br /> Will Ramsey County share in the street expense? <br /> At this point the city has no information on the need to spend <br /> dollars to upgrade this street. <br /> To answer your question about central location, again we selected <br /> a site that was best suited based on a number of parameters. We <br /> have two recreation complex sites identified in our comprehensive <br /> plan. One on the north side and one on the south side. Since we <br />
The URL can be used to link to this page
Your browser does not support the video tag.