My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/09/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
06/09/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 11:39:29 AM
Creation date
6/4/2021 3:08:52 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/09/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.General Provisions VI <br /> §1007.055 BATCH PLANTS. <br /> (1) Purpose. The purpose of this section is to provide standards for the establishment and <br /> use of Batch Plants intended to provide construction materials for a defined project within a limited <br /> timeframe. <br /> (2) Application. hi order to operate within the city a Batch Plant must be located within the <br /> Light Industrial, General Industrial, Rural Business Reserve, Rural Executive or Rural zoning <br /> districts,and must obtain an Interim Use Permit per§1007.017. <br /> (3) Requirements. In addition to the General Standards contained within §1007.017, <br /> Temporary Batch Plants are also required to comply with the following conditions and <br /> performance standards in order to obtain an Interim Use Permit: <br /> (a) The Batch Plant shall be located on the site so as to minimize the disturbance of <br /> surrounding dwelling units or commercial businesses. <br /> (b) The Batch Plant shall maintain a 50 foot setback from any wetland. <br /> (c) The project intended to be served by the batch plant and a deadline for removal <br /> shall be clearly defined. <br /> (d) The Hours of Operation shall be clearly defined. <br /> (e) Access to and from the site shall be reviewed and approved by the City Engineer <br /> prior to any site disturbance. <br /> (f) A grading,erosion and sediment control plan shall be submitted and approved by <br /> the City prior to any site disturbance. <br /> (g) A Storm Water Pollution Prevention plan shall be submitted and approved by the <br /> City prior to any site disturbance. <br /> (h) A restoration plan shall be submitted and approved by the City prior to any site <br /> disturbance. <br /> (i) All applicable Minnesota Pollution Control Agency requirements are satisfactorily <br /> met. <br /> 0) All applicable Rice Creek Watershed District requirements are satisfactorily met. <br /> (k) So as to maintain compatibility with the surrounding area and to protect the health, <br /> safety and general welfare of the public,the City Council may impose additional limitations, <br /> conditions or requirements as it deems necessary. <br /> 3-102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.