Laserfiche WebLink
PARK DEVELOPMENT COST ESTIMATE <br /> ERICKSON'S 2ND ADDITION r �1L� <br /> LINO LAKES, MINNESOTA (2,t (04 <br /> JEarthwork-by Developer <br /> Bit. Parking Lot with Conc. Curb & Gutter $ 4,500 <br /> Restroom/Warming Hut/Storage Bldg. 20 ' x 35' 38,500 <br /> Picnic Shelter 15,000 <br /> Play Equipment 15,000 <br /> Lookout Platform 5,000 <br /> Information Kiosk 5,000 <br /> 6" Water 3,300 <br /> 4" Sewer 1 ,300 <br /> Fire Hydrant• 1 ,000 <br /> Topsoil 10,000 <br /> Seeding 5,000 <br /> Irrigation System • So4fbuil-Cje 1d- 20,000 <br /> Culvert with Aprons-Z5 Ka i n9 r',''`k- 1 ,300 <br /> Agricultural Lime Softball Infield 3,000 <br /> Softball Backstop 2,000 <br /> Homeplate, Pitch Rubber & Bases 250 <br /> Hockey Rink Dasher Boards 5,000 <br /> Bituminous Path 5,500 <br /> Gravel/Wood- Chip Path 4,500 <br /> Park Identification Sign 500 <br /> Picnic Tables 3,000 <br /> Picnic Grills 1 ,500 <br /> Benches 2,000 <br /> Shade Trees 12,000 <br /> Evergreen Trees 5,000 <br /> Shrubs 2,000 <br /> TOTAL $171 ,150 <br /> � nS-i�.11e� <br /> pri ceS <br />