My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/12/1993 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1993 Park Board Packets
>
07/12/1993 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:17:20 PM
Creation date
6/18/2021 1:04:26 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
07/12/1993
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the possibilities of re-shaping the pond so that a trail might be <br /> ,-� installed on the east side for access. The other condition was <br /> that the Army Corps of Engineers would authorize this work to be <br /> done. The motion was seconded and unanimously carried. <br /> OPTIONS <br /> Please find enclosed a copy of a letter from Mr. Clyde Rehbein <br /> concerning his intents concerning these matters. Item no. 2 states <br /> that he is willing to construct a non-bituminous walking trail with <br /> on-site material along the east property line. The walking trail <br /> will be approximately 8 feet by 250 feet and will begin at the <br /> northeast corner of the property. Mr. Rehbein informed me that <br /> this meant a gravel trail. He also indicated that the city would <br /> be responsible for acquiring the necessary permits from the Corps. <br /> We have acquired the permit application and are now waiting for the <br /> wetland to be delineated. <br /> RECOMMENDATION <br /> Options: <br /> This is an update only at this point. <br /> Recommendation: Proceed with project. <br /> OPTION$> ` << >< <br /> Since the last neighborhood meeting we have been waiting for the <br /> approval of the Rice Creek Watershed to install the trail accesses <br /> to the park. In the interim, the neighborhood had submitted a <br /> petition to the city. Please see the attached petition and color <br /> coded map of the two resident petitions. Keep in mind that the <br /> first petition may contain resident signatures that no longer wish <br /> to be a part of the petition because of the new park location from <br /> the original petition. At the time of the original petition the <br /> park was being considered on the west side of the development. <br /> The Rice Creek Watershed has subsequently made a decision on the <br /> wetland issues of the development. They denied the trail going <br /> through the pond on the north side but approved the a trail on the <br /> south side as an access. Since the petitioners wish to have a <br /> trail around the park, the recommendation was made to pursue the <br /> purchase of an easement on the north side. <br /> In reference to my letter to the neighborhood, I feel that the <br /> petition is both appropriate and reasonable for the small area <br />
The URL can be used to link to this page
Your browser does not support the video tag.