Laserfiche WebLink
L 'ectioii 6- Park and Trail Systent Plan City of Lino Lakes <br /> Q <br /> figure 6.4 (Part 6 of 6). Trail System Legend <br /> <D, # Trail ' Approx. Length Descripdon1Future Development Issues <br /> Y' <br /> SS Bike Route 2.2 miles The bike route runs along Hodgson Road,which is a minor arterial roadway, from Lake Drive to Ash Street. <br /> 56 Bike Route 1,7 miles The bike route runs along 62nd Street, which is a State-Aid road, from Hodgson Drive to Holly Drive. <br /> S7 Bike Route 2.6 miles The bike route runs along Holly Drive,which is a collector Street, from Ash Street to County Road 21. <br /> S3 Bike Route 0.5 miles The bike route runs along 12th Avenue,which is a collector street, from Birch Street to Holly Drive. <br /> 59 Bike Route 2.5 miles The bike route runs along County Road 21,which is a collector street, from I-35B to Centerville. <br /> 60 Bike Route 2.1 miles The bike route runs along County Road 54,which is a collector street, from I-35B to Centerville. <br /> 61 Bike Route 3,0 miles The bike route runs along the frontage road from White Bear Lake Township to Main Street. <br /> 62 Transportation Trail 0.7 miles The trail runs along Main Street from Centerville to 2,4th Avenue. It is intended to be located within the existing road right-of-way, County <br /> and State standards will need to be adhered to as appropriate.A trail on one side of the road should be adequate to handle the anticipated <br /> traffic volumes.A Class II level of trail should be appropriate. <br /> 63 Bike Route 0.7 miles The bike route runs along Main Street,which is a minor arterial roadway, from Centerville to 24th Avenue, <br /> 4. <br /> 64 Transportation Trail 1.4 miles The trail runs along 24th Avenue from Cedar Street to the future business area. It is intended to be located within the existing road right- <br /> of-way. County and State standards should be adhered for consistency. A trail on one side of the road should be adequate to handle the <br /> anticipated traffic volumes.A Class II level of trail should be appropriate. <br /> 65 Transportation Trail OS miles The trail runs along Cedar Street from the frontage road to the trail along 24th Avenue, It is intended to be located within the existing <br /> road right-of-way.County and State standards should be adhered for consistency.A trail on one side of the road should be adequate to handle <br /> the anticipated traffic volumes. A Class II level of trail should be appropriate. <br /> Total Trail Miles Under This Plan <br /> Type Total Miles <br /> Park 14.1 miles (trails within linear trail corridors) <br /> Transportation 29.2 miles (located in road r,o.w, but separated from actual roadway) <br /> Bike Routes 37,7 miles (paved shoulders) <br /> -r <br /> Total 81.0 (combined miles of trails and bike routes) <br /> 6-4 i <br />